Polypure Inc. - Los Angeles - Executive Summary

| Accident History | Chemicals | Emergency Response | Registration | Source | Executive Summary |

                      EXECUTIVE SUMMARY 
 
This Risk Management Plan (RMP) has been prepared to meet the requirements of the Risk Management Program 
Rule.   
 
As part of complying with the Risk Management Program Rule, the Polypure Inc. facility in Los Angeles, 
California (Polypure) has reviewed and enhanced previously existing accidental release procedures and 
emergency response policies.  These policies include developing and implementing a formal Emergency Action 
Plan that includes the following: 
 
    Emergency Phone Numbers  
         Incident Notification Policy 
         Los Angeles County Fire Department 
 
                                       Plant Emergency Alarm          
         Recognition, Initiation, Evacuation, and Assembly 
 
    Plant Emergency Plan Responsibilities 
 
                                            Emergency Procedures - General      
         Fire Incident 
         Earthquake 
         Flooding 
         Bomb Threat 
         Off-site Leaks and Spills (T 
ransportation Incidents) 
         Emergency Procedures - Chemical Spills/Releases (General Information) 
         Section I - Chemical Spills/Releases (Other than Acutely Hazardous Materials) 
         Section II - Chemical Spills/Releases (Acutely Hazardous Materials) 
 
    Emergency Procedures - Employee Training 
         Employee Safety Training (General Overview) 
         New Employee Training 
         Basic Operator Training and Continuous Training 
         Emergency Drills 
         Training Records 
 
    Plant Inventories and Equipment Information 
         Site Map 
         Hazardous Material Plot Plan and Tank Designations 
         Emergency Safety Equipment List 
         Chemical Inventory 
 
There are two substances at the Polypure facility that are regulated by the Chemical Accident Prevention 
Provisions defined at 40 CFR Part 68.  These substances are used in various processes throughout the 
facility to produce water treatment polym 
ers. Substances that are used by Polypure that are regulated as 
either toxic substances or flammable substances by 40 CFR Part 68 are as follows: 
 
Toxic Substances: 
 
         Formaldehyde: Formaldehyde is received and stored as a 37 percent solution in water.  The maximum 
    amount of 37 percent formaldehyde stored on-site is 66,000 pounds (24,000 pounds pure formaldehyde). 
 
Flammable Substances: 
 
         Dimethylamine: The maximum amount dimethylamine stored on-site is approximately 70,000 pounds. 
 
 
Worst-case Scenarios: 
 
As required by the Risk Management Program Rule, worst case and alternative release scenarios were evaluated 
and are discussed in this RMP.  As required, worst case scenarios are presented in the RMP for one toxic 
substance and one flammable substance.  Alternative scenarios were prepared for each of the toxic substances 
with worst case endpoints located offsite and for one flammable substance.  The endpoint represents the 
distance at which a released substance  
must travel before it disperses sufficiently to no longer pose a 
hazard to the public.   
 
For the worst case scenario, EPA has defined a worst-case release as the release of the largest quantity of 
a regulated substance from a vessel or process line failure that results in the greatest distance to a 
specified endpoint.  For the worst-case analysis, the possible causes of the worst-case release or the 
probability that such a release might occur are not considered.  The release is simply assumed to take place 
and the greatest amount held in a vessel is suddenly released.  The results of the worst case scenario 
analysis were as follows: 
 
         Toxic Substances: The formaldehyde storage tank was assumed to fail and subsequently produce an 
    instantaneous release of the entire tank contents.  The release was assumed to evaporate over a 
    10-minute time period.  The passive mitigation control of the tank dike were considered in limiting 
    the release impacts.  The distance to th 
e toxic endpoint was estimated to be less than 0.19 miles. 
 
         Flammable Substances: The dimethylamine storage tank was assumed to fail and subsequently  produce 
    an instantaneous release of the entire tank contents that results in a vapor cloud explosion.  No 
    passive mitigation controls were considered in limiting the release impacts.  The distance to the 
    explosion endpoint was estimated to be less than 0.31 miles. 
 
 
Alternative Release Scenarios: 
 
Alternative release scenarios are more realistic scenarios that result in endpoints that affect public 
receptors.  For formaldehyde the release was assumed to occur as a result of the uncoupling or rupture of a  
transfer hose during unloading operations into a contained area.  For flammable materials, the alternative 
release scenario assumed that dimethylamine was released as a result of the uncoupling or rupture of a hose 
during unloading operations. The durations for releasing these materials from a vessel/pipe for th 

alternative release scenarios were assumed to occur over a 3-minute time period for formaldehyde and a 5- 
minute period for dimethylamine since the unloading operations are supervised.  With the exception of 
considering that these transfer operations are monitored by personnel at all times, no other active 
mitigating controls were assumed to limit the releases. The results of the alternative release scenario 
analysis were as follows: 
 
         Toxic Substances: 
                   Formaldehyde, 37 percent - 0.06 miles 
 
         Flammable Substance: 
                   Dimethylamine - 0.06 miles 
 
 
Prevention Program: 
 
To address potential accidental releases, an accidental release prevention program along with 
chemical specific prevention steps have been developed. The key parts to the program are:   
 
    Formal Company Risk Management Procedure that includes: 
         Management System Responsibilities 
         Risk Management Plan Coordinating Review Team 
 
       Risk Management Plan Changes and Updating 
         Recordkeeping Requirements 
         Communication and Coordination of Risk Management Information 
 
    DOT Hazardous Material Training 
    Contractor Performance Selection Process 
    Operating Procedures 
    Emergency Procedures 
    New Employee Environmental Health and Safety Orientation Training Program 
    Process Safety Program Auditing 
    Engineering Controls that Include Automatic Level and Interlock Alarms and Shutdowns 
    24-hour Emergency Communications 
 
Additionally, the facility has programs to address the OSHA Process Safety Management (PSM) 
requirements for the chemicals formaldehyde and dimethylamine such as: 
 
    Employee Participation 
    Process Safety Information 
    Process Hazard Analysis 
    Operating Procedures 
    Training 
    Contractor Safety 
    Pre-startup Safety Reviews 
    Mechanical Integrity 
    Hot Work Permit 
    Management of Change 
    Incident Investigation 
    Emerge 
ncy Planning and Response 
    Compliance Audits 
 
 
Emergency Response Program: 
 
The facility also has an emergency response program (ERP) that has been enhanced as part of 
implementing the Risk Management Program.  The ERP has historically been coordinated with 
the Los Angeles County Fire Department, Hazardous Materials Division.  As part of the community involvement 
efforts, the facility's management participates in the local CAER group efforts.  
 
As part of preparing the RMP, the facility's five year accident history was reviewed. No accidental releases 
from covered processes have occurred that resulted in deaths, injuries, or significant property damage 
on-site or off-site; or resulted in off-site evacuations or sheltering in place.  
 
 
Safety Improvement: 
 
Polypure is committed to continuous improvement of safety.  Planned changes and policies to promote this 
improvement include the continuous review and update of the plant safety program and annual emergency drills 
to determine and 
improve upon deficiencies.  Efforts to update and implement additional safe work practices 
and policies are ongoing and include areas such as: 
 
    Hazard Communication 
    Confined Space Entry 
    Line Breaking Procedures 
    Lock-out Tag-out
Click to return to beginning