Starkville Wastewater Treatment Facility - Executive Summary

| Accident History | Chemicals | Emergency Response | Registration | Source | Executive Summary |

Risk Management Program 
Executive Summary  
 
Starkville Wastewater Treatment Facility 
Starkville, Mississippi 
 
 
1.0  Introduction 
 
The City of Starkville operates a wastewater treatment facility in Starkville, Oktibbeha County, Mississippi. Due to the quantity of chlorine stored at the facility the facility is subject to the United States Environmental Protection Agency's Risk Management Program.  
 
The purpose of the Risk Management Program is to prevent or reduce the severity of an accidental release of a hazardous chemical. Among the requirements of the Risk Management Program is the submission of a Risk Management Plan (RMP) summarizing the overall program. The following information is an Executive Summary of the information contained in the Risk Management Program. This Executive Summary includes a description of the facility's accidental release prevention and safety policies, a facility and process description, an explanation of the accidental release scenarios studied, a five-yea 
r accident history, and details of the facility's accidental release prevention program. 
 
2.0  Accidental Release Prevention Policies 
 
The City of Starkville takes great care to ensure the safety of its employees and the surrounding community. Safety programs and policies are stressed in all aspects of facility operations. 
 
The City of Starkville's safety program provides rules and guidance for the safe operation, maintenance, and construction of the treatment facility. The safety program includes the required personal protective equipment and safe work practices including lockout and tagout, hot work permitting, confined space entry, and hazardous chemical handling.  
 
3.0  Facility and Process Description 
 
The Starkville Wastewater Treatment Facility treats domestic and industrial wastewater for the City of Starkville. 
 
4.0  Regulated Substances Present 
 
Chlorine is the only substance used at the facility that is subject to the Risk Management Program regulations.  
 
5.0  Release Scena 
rios 
 
As required by the Risk Management Program regulations, The City of Starkville determined the offsite impact of an accidental release for both a worst case release and an alternate release scenario. 
 
The regulations define the worst case release as the loss of the entire maximum inventory of the largest tank or vessel. The regulations require that the offsite impact of the worst case release be calculated using very conservative, worst case, weather conditions. USEPA has published reference tables to be used in calculating the distance offsite that an accidental release would travel. These tables employ very conservative assumptions and therefore provide conservative estimates of the offsite distance that an accidental release would travel. The City of Starkville used the USEPA reference tables to calculate a worst-case offsite impact radius. 
 
The City of Starkville also calculated the offsite impact distance for an alternate, more realistic accidental release scenario. This rele 
ase scenario took into consideration safety systems and controls in place to reduce the severity of an accidental release and considered a more realistic release rate of the flammable chemical. The alternate release considered resulted from a hose rupture between the chlorine storage tank and the chlorine applicator. 
 
6.0  Accidental Release Prevention Program 
 
The facility's accident prevention program includes each of the elements required by the Risk Management Program regulations.  
 
6.1 Process Safety Information 
 
The City of Starkville has gathered the necessary documentation of safety information on the covered process including the maximum/minimum pressure, temperature, and inventory in covered tanks, the tank and piping materials of construction, documentation of design codes and standards used for the tanks and piping, and a description of safety systems in place. This information is periodically reviewed to ensure that the process is constructed according to good engineering  
practices. 
 
6.2  Process Hazard Review 
 
A Process Hazard Review has been conducted on the covered processes to determine the potential hazards of the process and to determine the possible equipment failures or human errors that could lead to a release. The results of the review were used to determine the appropriate safeguards needed to prevent failures or errors that could lead to a release. 
 
6.3  Operating Procedures 
 
Written operating procedures have been developed for operations. The purpose of the written operating procedures is to make sure that each employee before operating a process is knowledgeable of the correct operating methods, is aware of the chemical hazards present, and is qualified to respond correctly in an emergency situation. 
 
6.4  Training 
 
New employees are trained in the safe operation of plant processes and their performance is periodically evaluated. As needed, refresher training is provided. Employees are given safety training and are trained in the emergency 
response procedures discussed in Section 8.0. 
 
6.5  Maintenance 
 
Written maintenance procedures and training guide the safe work practices of maintenance employees and ensure that they are made aware of the potential hazards of the plant processes. A hot work permitting program, lockout tagout procedures, and confined space entry procedures have been put in place to protect maintenance workers while servicing equipment. Preventive maintenance inspections and testing are schedule based on manufacturers recommendations so that aging equipment can be replaced before failing and possibly causing an accidental release. 
 
7.0  Five Year Accident History 
 
No serious accidents have occurred at the facility in the last five years. 
 
8.0  Emergency Response Coordination 
 
Facility personnel will not respond to a significant release of chlorine but will contact offsite emergency responders. The facility has developed an emergency plan for responding to small releases and for contacting emergency re 
sponders in the event of a large release. 
 
9.0  Planned Future Safety Enhancements 
 
Planned safety enhancements include the continued development of the facility's preventive maintenance program and ongoing safety training and new employee orientation. Together, these programs will continue to ensure the safety of employees and the community.
Click to return to beginning