Allegheny Valley Wastewater Treatment Plant - Executive Summary

| Accident History | Chemicals | Emergency Response | Registration | Source | Executive Summary |

Allegheny Valley Joint Sewage Authority 
Wastewater Treatment Plant 
Risk Management Program 
 
EXECUTIVE SUMMARY 
 
A. The accidental release prevention policy at the Allegheny Valley Joint Sewage Authority treatment facility involves a combined effort between management, operating and local emergency personnel.   The facility has an ongoing effort to identify hazards, review safety techniques, and implement employee training through operation, maintenance and inspection procedures to manage the risk of a chlorine gas release.  
 
B. The Allegheny Valley Joint Sewage Authority treatment facility was originally placed into operation in 1961.  The facility was expanded both in 1980 and 1993.  The facility currently has the capacity of treating 5.1 million gallons per day of wastewater.  Gaseous chlorine, which is stored in a separate room, is utilized to disinfect the effluent prior to discharging to the receiving water.  The amount of chlorine handled is three one-ton containers for a total of 
6,000 pounds.  The chlorine gas feeders are cylinder-mounted and are designed for conveying the gas under vacuum.  The chlorine system is inspected daily by the wastewater treatment plant operating personnel.  The facility is manned approximately 18 hours per day. 
 
C. The offsite consequence analysis includes consideration of two chlorine release scenarios, identified as "worst case" and "alternate case".  EPA's RMP Guidance for Wastewater Treatment Plants Reference Tables were utilized in the evaluation of both scenarios. 
 
As defined by EPA, the worst case analysis is based upon a release of chemical in a quantity equal to the greatest amount held in a single vessel over a period of 10 minutes.  In the case of the Allegheny Valley WWTP, the release quantity would equal 2,000 pounds.  Utilizing EPA's assumptions, a distance to toxic endpoint of 1.3 miles and an estimate of population potentially affected of 2,900 resulted. 
 
The alternate release scenario involves the misalignment of t 
he lead washer on the controller, causing a chlorine gas leak through an opening 3/16" diameter.  For this scenario, it was assumed that the leak started at the same time the wastewater treatment facility became unmanned.  Since there is only a warning light and no sounding alarm in the case of a chlorine leak, it was assumed that the leak would go unnoticed for the entire duration of the treatment facility being unmanned.  Again utilizing EPA's assumptions relative to meteorological conditions and a chlorine release rate of 5 pounds/minute, a distance to toxic endpoint of 0.1 mile and an estimate of population potentially affected of 20 people resulted.  In the determination of an "alternate case" scenario, actuation of the chlorine detector and availability of the ton-cylinder repair kit were both considered.  Another form of active mitigation present at the Allegheny Valley wastewater treatment facility are the vacuum-type chlorinators with all chlorine gas piping under vacuum. 
 
D.  
In general, the Allegheny Valley Wastewater Treatment Facility's accidental release prevention program is based on the following: 
 
* Compilation of safety information for chlorine storage 
* Review of potential on-site hazards of the chlorine process 
* Preparation of written operating procedures for safely conducting any activity involving the chlorination process 
* Implementation of employee training program 
* Preparation of written maintenance and inspection techniques and schedule for safe operation of the chlorine system 
 
As an integral part of the prevention program, the Allegheny Valley Joint Sewage Authority will perform a compliance audit at least once every 3 years.  The compliance audit will include a review of all aspects of the risk management program in conjunction with corrective actions if any deficiencies exist.  Written documentation of the audit will be maintained on-site. 
 
Any incident that results in, or could have resulted in, a catastrophic release of chlorine will 
be investigated immediately.  A summary of the investigation and corrective actions will be documented and maintained at the treatment facility. 
 
Chemical-specific prevention measures include the facility having the appropriate safety equipment on-site including a chlorine detection device, self-contained breathing apparatuses, and a ton-cylinder repair kit.  The facility promotes training and educating the employees relative to acceptable operating and handling techniques of chlorine gas. 
 
E. No accidental releases of chlorine have occurred at this facility in the past five years. 
 
F. The facility is included under the Local Emergency Planning Committee (LEPC) of Allegheny County's written emergency response plan.  Release response procedures by all involved parties, evacuation procedures, and training exercises are included within the plan.  The public is to be notified by the County Emergency Management Agency as soon as a release occurs. Evacuation route has been mapped within the 
plan.  The plan is reviewed/updated annually by the facility emergency coordinator. 
 
The Allegheny Valley WWTP employees will not respond to accidental releases of chlorine gas.  Emergency responders will include the local fire department, police department, emergency medical service, and HAZMAT team. 
 
G.    There are no actions planned to improve safety regarding the chlorine system at this time.
Click to return to beginning