EXECUTIVE SUMMARY 
 
Chlorine is the most commonly used substance for disinfecting treated wastewater.  The Miami-Dade Water & Sewer Department (MDWASD) North District Wastewater Treatment Plant (WWTP) also uses chlorine (for chlorination) for disinfecting treated wastewater to provide safe water discharges to the environment.  Storing and handling large quantities of chlorine can create hazardous situations.  The North District WWTP takes safety obligations in storing and using chlorine as seriously as it takes care in providing the environment safe disinfected water. 
 
The North District WWTP chlorine handling process is subject to the U.S. Environmental Protection Agency (EPA) Risk Management Program Rule.  This regulation requires submission of a Risk Management Plan (RMP).  An integral part of the RMP is a summary of policies and procedures followed to safely operate the facility, including a description of the possible consequences in case of an accident and the actions, which will  
be taken, by the facility in an event of an emergency. 
 
The following information is specifically required in the RMP Executive Summary:  
 
* Accidental release prevention and emergency response policies. 
 
* General facility and regulated substances information. 
 
* Offsite consequence analysis results. 
 
* Summary of the accidental release prevention program and chemical-specific prevention steps. 
 
* Five-year accident history summary. 
 
* Emergency response program summary. 
 
* Planned changes to improve safety. 
 
The above information for the North District WWTP chlorination system is provided below. 
 
Accidental Release Prevention and Emergency Response Policies 
 
The MDWASD accidental release prevention policy involves a unified approach that integrates proven technology, trains staff in operation and maintenance practices, and uses tested and proven management system practices.  All applicable procedures of the EPA's Prevention Program are adhered to, including key elements such as train 
ing, systems management, and emergency response procedures.   
 
The MDWASD emergency response policy involves the preparation of emergency response plans for hazardous materials which are tailored to each facility and to the emergency response services available in the community, and is in compliance with the EPA Emergency Response Program Requirements.  North District WWPT has prepared an Emergency Response Plan for Hazardous Materials to facilitate coordination and emergency planning with offsite response officials and facilities in the event of an emergency. 
 
General Facility and Regulated Substance Information 
 
The MDWASD North District WWTP is located at 2575 NE 151 Street, in N. Miami, Florida.  North District WWTP is bounded by Sunny Isles Boulevard on the north, the Oleta River on the east, North East 151 Street to the south, and Route 1 to the west.  The treatment plant has a rated capacity of 112 million gallons per day (mgd).  The facility currently stores and uses chlorine,  
a regulated toxic substance under the EPA rule.  Chlorine is delivered in one-ton containers to the North District WWTP chlorine building.  The chlorine building is divided into a storage room and a chlorinator room.  The one-ton containers contain liquid chlorine under pressure.  The chlorine building is equipped to store up to 16 (containers) tons of chlorine. An estimated 6,400 pounds of chlorine is used per day depending on the season of the year.  The maximum quantity of chlorine present at the North District WWPT at any given time exceeds the listed threshold quantities in the EPA rules.  It also exceeds the listed threshold quantities in the federal Occupational Safety and Health Administration (OSHA) Process Safety Management (PSM) Standards.   
 
The pressure from the chlorine container forces liquid chlorine through the tubing and into the manifold system.  Downstream of the manifold system there is a pneumatically actuated automatic shut-off valve.  The valve will also close a 
utomatically (or manually) when the chlorine sensor senses a leak.  The liquid chlorine flows through the automatic shut-off valve to the evaporators.  At the evaporators the liquid chlorine is heated and converted into chlorine gas.  The gas then flows from the evaporator through the temperature actuated control valve and the vacuum regulator to the chlorinator.  The chlorinators are used to control the feed rate of the chlorine gas.  The chlorinators are equipped with a gas rotameter and a v-notched orifice for controlling the feed rate.   Injection of the chlorine into the plant water produces the concentrated solution that flows through piping to various injections points in the treatment process. 
 
The North District WWTP is also provided with a number of safety features to protect the employees and the surrounding community.  The three important safety features are (1) automatic shut-off valves, (2) chlorine leak detection and alarm system, and (3) emergency chlorine gas scrubber  
system.  The automatic shut-off valves are located immediately downstream of the chlorine containers.  Therefore, if a leak occurs anywhere in the system (other than in the pigtail or the container itself) the chlorine source can be isolated and the flow of chlorine can be stopped.  The automatic shutoff valves are operated (closed) either automatically due to the detection of chlorine leak by the chlorine sensors or manually by pushing a switch.  Emergency shutoff switches are located inside the chlorine storage room and in the chlorinator room. 
 
The leak detection system consists of chlorine gas sensors located in both the chlorinator room and the storage room.  The leak detection system is set to activate the alarms and safety processes when a chlorine concentration of 0.5 ppm or higher is detected.  When the leak detection system detects a leak, audible and visual alarms (both local and in the control room) are activated and the automatic shut-off valves closed.  The tripped chlori 
ne alarm will also cause the intake louvers to close and start the chlorine scrubber system. 
 
Operations personnel can activate the emergency chlorine scrubber system automatically by the chlorine detection system or manually when a chlorine leak is detected.  The scrubber system activates the withdrawal of the contaminated air from the chlorine container storage room and chlorinator room and neutralization of the chlorine gas upon contact with the caustic solution in the scrubber.  In the event of a leak, the scrubber will continue operating until manually turned off.  The scrubber is designed to recirculate the air and chlorine gas until the chlorine has been neutralized. 
 
Perimeter fence and security gates surround the North District WWTP.  The Plant operates three shifts with employees onsite 24 hours per day, 365 days per year. 
 
The North District WWTP is provided with a backup emergency power generator that supplies power for the entire facility. 
 
Offsite Consequence Analysis Res 
ults 
 
The offsite consequence analysis includes consideration of two chlorine release scenarios, identified as "worst-case release scenario" and "alternative release scenario". The first scenario is defined by EPA, which states that "the owner or operator shall assume that the maximum quantity in the largest vessel is released as a gas over 10-minutes," due to an unspecified failure. The alternative scenario is defined as "more likely to occur than the worst-case release scenario". 
 
Chlorine is the only regulated toxic substance stored and handled at the North District WWTP, which is subject to the RMP rule.  Thus, chlorine was selected for the worst-case release scenario.  Only passive or administrative controls are allowed under this scenario to reduce off-site impacts.  The scenario used for the North District WWTP is the rupture of a single one-ton chlorine container resulting in the release of 2,000 pounds of chlorine over a 10-minute duration.  There are no passive or administrat 
ive controls at the North District WWTP for the chlorine storage containers; thus, the chlorine release rate will be 200 lb./min. 
 
The released liquid chlorine is assumed to form a denser-than-air cloud consisting of chlorine vapor and liquid droplets (aerosols) and then disperse in the atmosphere.  The distance to the toxic endpoint was estimated using the EPA's RMP*Comp software (version 1.06).  The toxic endpoint selected by EPA rules for chlorine is 3 ppm, which is the Emergency Response Planning Guideline Level 2 (ERPG-2).  The toxic endpoint was conservatively set by EPA to ensure public notification and that local emergency response planning takes into account the greatest possible impacted area surrounding the release point. EPA-mandated meteorological conditions, namely atmospheric Stability Class F, wind speed of 1.5 meter per second, highest daily maximum temperature (77 deg F), and average relative humidity (50%) were used for the worst-case release scenario analysis.  The  
results of the dispersion analysis indicated that the worst-case release scenario has offsite impacts. 
 
RMP rules require that a scenario which results in offsite toxic endpoint distance and is more likely to occur than the worst-case scenario should be selected as the alternative release scenario, unless no such scenario exists.  The alternative scenario may also be an actual event, which occurred at the facility.  Unlike the worst-case scenario, the alternative release scenario may consider "active" mitigation such as automatic shutoff valves, excess flow valves, and containment with scrubbers.  Active mitigation is defined as requiring mechanical, electrical, or human input. 
 
The alternative release scenario selected involves the release of chlorine from a pigtail (1/4" diameter) rupture, which occurs during the connection of the chlorine container to the chlorination process and the chlorine scrubber does not operate.  The normal response of the operator is to shut-off the containe 
r valve.  However, the operator may become incapacitated, leaving the valve open.  It is assumed that approximately 15 to 30 minutes would be required for the emergency response team to respond to the accident.  In the meantime, all of the chlorine in the container would have been released.  The chlorination facility (chlorine building) is equipped with a scrubber that may abate any chlorine release but was not considered in performing the consequence analysis for the alternative release scenario.  However, the chlorine storage building mitigating effect was considered for estimating the chlorine release rate to the outside atmosphere and in estimating the toxic endpoint distance. The chlorine release rate from the one-ton container was estimated at 154 pounds per minute; thus, the whole container would be emptied in about 13 minutes.  To account for building mitigation, a reduction factor of 45% was used as per EPA offsite consequence analysis guidance.  This results in an estimate of 
85 pounds per minute of chlorine release from the building. 
 
The alternative release scenario toxic endpoint distance was also estimated using the RMP*Comp (version 1.06) software.  Toxic endpoint for chlorine is 3 ppm.  EPA suggested typical meteorological conditions used were Stability D, wind speed of 3.0 meter per second, average air temperature of 77 deg F, and average relative humidity of 50 percent.  The results of the dispersion analysis indicated that the alternative release scenario has offsite impacts. 
 
Summary of the Accidental Release Prevention Program and Chemical-Specific Prevention Steps 
 
North District WWTP is in compliance with Federal and State Process Safety Management requirements.  North District WWTP accidental release prevention program is based on the following key elements: 
 
* Detailed management system. 
 
* Comprehensive process safety information that is readily available to staff, emergency responders, and contractors. 
 
* Comprehensive preventive maintenan 
ce program. 
 
* Performance of process hazard analysis of equipment and procedures with operation and maintenance staff participation and review. 
 
* Use of state-of-the-art process and safety equipment. 
 
* Use of accurate and effective operating procedures, written with the participation of the operators. 
 
* Training of the operators and maintenance staff. 
 
* Implementation of an incident investigation program. 
 
Chemical-specific prevention steps include availability of self-contained breathing apparatus (SCBA), awareness of the hazardous and toxic properties of chlorine, presence of chlorine detectors and alarms, and emergency chlorine gas scrubber system. 
 
Process and Chemical Safety Information 
 
Comprehensive chemical data have been assembled to include regulatory reporting and action thresholds, health hazard, and chemical exposure limitations, as well as detailed physical properties of chlorine.  This information includes chlorine background information and MSDS sheets. 
 
Equipment  
safety information was meticulously compiled on the chlorine process.  Specifications for chlorine process are collected and provided in one place for easy reference. Details such as maximum intended inventory; safe upper and lower temperatures; safe upper and lower pressures; and codes and standards used to design, build, and operate the processes are on file at the facility.  
 
Process Hazard Analysis  
 
In 1997, detailed Process Hazard Analysis (PHA) was conducted for chlorination system equipment and procedures.  To further assess the integrity of the chlorine system for the preparation of this RMP, a chlorine system checklist was used to assess the overall general condition of the chlorine system operation and maintenance, including human factors that affect personnel performance and system integrity.  The PHA will be updated again within a five-year period or whenever there is major change in the process.  A list of recommended actions were developed to further improve the chlorine 
safety and staff is currently evaluating these recommendations.  Staff will document the completion of recommended actions. 
 
Operating Procedures 
 
MDWASD North District WWTP has prepared written operating procedures that provide clear instructions or steps for safely conducting activities relating to chlorination process. They are consistent with the chlorine Process Safety Information.  Written operating procedures include: initial startup, normal operations, emergency shutdown, normal shutdown, and start up after emergency shutdown.  In addition, North District WWTP developed Standard Operating Procedures (SOPs) for the following steps in the chlorination process: receipt of chlorine delivery, chlorine cylinder change, and chlorine release/spill response.  Operating procedures will be developed and put in place prior to any new process equipment coming on line or changes made in the handling of chlorine equipment, and reconfiguration of the facilities. 
 
Training  
 
North District WWT 
P employees presently involved in operating or maintaining the chlorine process are trained in an overview of the process and detailed applicable operating and maintenance procedures.  North District WWTP ensures that each employee newly assigned to the process, is trained and tested to be competent in the operating procedures listed pertaining to their duties.  Each employee (presently involved in operating the chlorine process) has been trained to receive the required knowledge, skills, and abilities to safely carry out the duties and responsibilities, including chlorine emergency response, as provided in the operating procedures.   
 
Refresher training is provided every three years or less to each employee operating the covered process to ensure that the employee understands and adheres to the current operating procedures.  In addition, the North District WWTP ensures that operators are trained in any updated or new procedures prior to startup of a process after a major change as ind 
icated in their Management of Change procedures. 
 
The North District WWTP prepares and retains records of initial and refresher training, provides certification of the records, which includes the identity of the employee, the date of training, and the signature of the person (s) administering the training. 
 
Contractors 
 
MDWASD North District WWTP has procedures and policies in place that specify the information required to be provided to the contractors performing work on the chlorination process, the training requirements for contractor employees, and mechanism to obtain assurance from contractors that they have informed their employees of the appropriate safety rules. MDWASD North District WWTP is required to provide information and explanations concerning the hazards and processes and obtain and evaluate information regarding the contractor's safety program.  
 
Pre-Startup Safety Review and Mechanical Integrity Program 
 
MDWASD North District WWTP has procedures in place to ensure tha 
t a pre-startup safety review is conducted prior to starting up a new covered process or after shutdown event, or prior to starting up modifications to the chlorination process that requires a MOC procedure implementation.   
 
Hot Work Permits and Management of Change  
 
The North District WWTP requires employees and contractors to employ safe work practices when performing "hot work" in, on, or around the covered process.  The North District WWTP uses a permitting program to ensure hot work is conducted safely on or near a process involving chlorine.  
 
Internal Compliance Audits 
 
Internal compliance audits will be conducted every 3 years to verify compliance with the programs and procedures contained in the RMP.  The North District WWTP will assemble an audit team that will include personnel knowledgeable in the Risk Management Program rule and in the process.  This team will evaluate whether the prevention program satisfies the requirements of the Risk Management Program rule and wheth 
er the prevention program is sufficient to help ensure safe operation of the process.  The results of the audit will be documented, recommendations resolved, and appropriate enhancements to the prevention program will be implemented. 
 
Incident Investigation 
 
The North District WWTP investigates all incidents that could reasonably have resulted in a catastrophic release (serious injury to personnel, the public, or the environment) so that similar accidents can be prevented.  An investigation team is assembled and the investigation is initiated within 48 hours of the incident.  The results of the investigation are documented, recommendations are resolved, and appropriate process enhancements are implemented.  Information found during the investigation is reviewed by affected staff and added or used to revise operating and maintenance procedures. 
 
Five-year Accident History Summary 
 
There has been one accidental release involving chlorine.  The release occurred on December 29, 1996 at 2:3 
0 am.  The amount of liquid chlorine released was approximately one ton.  The released liquid chlorine was contained in the room.  The chlorine was eventually dissipated through the scrubber system.  The release caused an on-site injury where three workers inhaled chlorine gas and were hospitalized.  There was no off-site impact.  As a result of this accident the flexible tubing that connects to the cylinder valve will be replaced on regular basis and yoke valve will be used on the connectors.  In addition, employees were instructed to use extra caution and proper equipment while changing chlorine cylinders. 
 
Emergency Response Program Summary 
 
The North District WWTP is a first responder, plant employees respond to chlorine accidental releases.  Depending on the severity of the accidental release, external resources such as the Metro-Dade Fire Department may be solicited to aid in handling a chlorine release.  As part of the emergency response program, the North District WWTP has deve 
loped and implemented an emergency response plan for the purpose of protecting public health and the environment. 
 
The emergency response plan has been coordinated with local response agencies (Metro-Dade Fire Department).  The main elements of the emergency response plan are: (1) chlorine response flow chart, responsibilities of various personnel at the facility, duties of on-scene incident commander, and site safety representative, (2) details of emergency recognition and prevention at the facility, (3) procedures for planning and coordination with off-site emergency response organizations, and (4) details of the training program for all employees involved with the chlorination process.  
 
Planned Changes to Improve Safety 
 
Numerous changes to improve safety (recommended actions) were previously identified for the chlorine process in 1997 for chlorination system equipment and procedures, when a Process Safety Management (PSM) Plan was prepared.  All of these recommended actions have b 
een evaluated for implementation as required.