UAP Northern Plains Grace City ND - Executive Summary

| Accident History | Chemicals | Emergency Response | Registration | Source | Executive Summary |

For further information contact: Paul Topp, Plant Manager 
 
RISK MANAGEMENT PLAN - EXECUTIVE SUMMARY 
 
I. THE FACILITY POLICY 
 
A. THE OWNER, MANAGEMENT, AND EMPLOYEES OF UAP NORTHERN PLAINS, GRACE CITY ND, ARE COMMITTED TO THE PREVENTION OF ANY ACCIDENTAL RELEASE OF ANHYDROUS AMMONIA. IF AN ACCIDENTAL RELEASE SHOULD OCCUR, THE FACILITY IS PREPARED TO WORK WITH THE LOCAL FIRE DEPARTMENT, LEPC, OR OTHER AUTHORITIES, TO MITIGATE ANY RELEASE AND TO MINIMIZE THE IMPACT OF THE RELEASE ON PEOPLE AND THE ENVIRONMENT. 
 
II. FACILTY INFORMATION: 
 
A. THE PRIMARY ACTIVITY AT THE FACILITY IS THE STORAGE AND HANDLING OF ANHYDROUS AMMONIA FOR THE SALE TO FARMERS. 
 
B. ANHYDROUS AMMONIA IS RECEIVED, STORED, AND DISTRIBUTED FOR APPLICATION ON CROPS AS A FERTILIZER NUTIENT. 
 
C. THE MAXIMUM QUANTITY STORED WOULD BE 131,580 POUNDS IN A 30,000 GALLON STORAGE TANK. (Note: maximum quanity alllowed to be stored is 85% of the storage tank size) 
 
III. THE WORST-CASE RELEASE SCENARIO AND THE ALTERNATIVE RELEASE SCEN 
ARIO: 
 
A. THE WORST-CASE RELEASE SCENARIO WOULD BE THE RELEASE OF THE TOTAL CONTENTS OF THE STORAGE TANK OVER TEN MINUTES. THE MAXIMUM QUANITY RELEASED WOULD BE 131,580 POUNDS, WHICH REPRESENTS THE VOLUME OF THE STORAGE TANK AT 85 PERCENT CAPACITY AS LIMITED BY DESIGN STANDARDS. THE DISTANCE TO THE ENDPOINT (point of dispersion to 200 ppm) IS 1.06 MILES. 
 
B. THE ALTERNATIVE RELEASE SCENARIO IS BASED ON A RELEASE FROM A BREAK IN A TRANSFER HOSE. THE DISTANCE TO THE ENDPOINT (point of dispersion to 200 ppm) IS .31 MILES. 
 
IV. THE ACCIDENT RELEASE PREVENTION PROGRAM: 
 
A. THE FACILITY HAS IMPLEMENTED THE PROVISIONS OF THE SAFETY REQUIREMENTS FOR THE STORAGE AND HANDLING OF ANHYDROUS AMMONIA, K-61.1, PUBLISHED BY THE AMERICAN NATIONAL STANDARDS INSTITUTE INC. 
 
B. THE FACILITY HAS IMPLEMENTED THE STANDARDS OF THE US OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) 29 CFR 1910.111, STORAGE AND HANDLING OF ANHYDROUS AMMONIA. 
 
V. THE FIVE YEAR ACCIDENT HISTORY: 
 
A. THERE HAS BEEN NO ACCIDEN 
TAL RELEASES OF ANHYDROUS AMMONIA IN THE PAST FIVE YEARS THAT HAVE CAUSED ANY DEATH, INJURIES, OR SIGNIFICANT PROPERTY DAMAGE AT THE FACILITY, NOR HAVE RESULTED IN OFF-SITE DEATHS, INJURIES, EVACUATIONS, SHELTERING IN PLACE, PROPERTY DAMAGE, OR ENVIRONMENTAL DAMAGE. 
 
VI. THE EMERGENCY RESPONSE PROGRAM: 
 
A. THE FACILITY HAS A WRITTEN EMERGENCY ACTION PLAN, IN ACCORDANCE WITH OSHA STANDARD 29 CFR 1910.38. 
 
B. THE FACILITY HAS PROVIDED TO THE STATE AND LOCAL AUTHORITIES, THE EMERGENCY PLANNING AND COMMUNITY RIGHT-TO-KNOW INFORMATION AS REQUIRED UNDER SARA TITLE III (EPCRA). 
 
C. THE FACILITY HAS A WRITTEN EMERGENCY RESPONSE PROGRAM, IN ACCORDANCE WITH OSHA STANDARD 29 CFR 1910.120, INCLUDING PRE-EMERGENCY PLANNING AND EMPLOYEE TRAINING. 
 
VII. PLANNED CHANGES TO IMPROVE SAFETY: 
 
A. SAFETY IMPROVEMENT IS AN ON-GOING PROCESS AT THE FACILITY. PERIODIC EVALUATIONS ARE PREFORMED TO ASSESS THE MAINTENANCE OF SAFE CONDITIONS AND EVALUATE EMPLOYEE TRAINING. THERE ARE NO SPECIFIC ANHYDROUS AMMONIA S 
AFETY RECOMMENDATIONS AT THIS TIME.
Click to return to beginning