Clorox Products Manufacturing Company - Executive Summary |
Executive Summary for The Clorox Products Manufacturing Company, Houston Texas 1. Accidental Release Prevention and Emergency Response Policies We at The Clorox Products Manufacturing Company (Clorox) are strongly committed to employee, public and environmental safety. This commitment has led us to develop a comprehensive accidental release prevention program that includes design, installation, operating procedures, maintenance, and employee training associated with the processes at our facility. It is our policy to implement appropriate controls to prevent possible releases of regulated substances. If a release should occur, our highly trained emergency response personnel are on site to control and mitigate its effects. We have coordinated our emergency procedures with the Houston Fire Department's HAZMAT Team and our LEPC, which provides additional emergency response expertise. To learn more about The Clorox Company please visit our web page at: WWW.CLOROX.COM. 2. The Statio nary Source and the Regulated Substances Handled Our facility's primary activity involves the manufacture of Clorox household bleach. We have one regulated substance present at our facility -- chlorine. Chlorine is used in the production of sodium hypochlorite, which is the active ingredient in Clorox bleach. The largest single container of chlorine at our facility is 180,000 pounds -- the capacity of the railcar in which the chlorine is received. The covered process at this facility as defined by the EPA is the chlorine handling system that includes storage and use of this regulated substance in the production of sodium hypochlorite. 3. The Worst Case Release Scenario and the Alternative Release Scenario, including administrative controls and mitigation measures to limit the distances for each reported scenario To perform the required off-site consequence analysis for our facility, we have used the look-up tables and equations provided by the EPA in the RMP Off-Site Consequence Analysis Guidance and the RMP*Comp modeling software recommended by the EPA. This detailed information has been submitted to the EPA and to our Local Emergency Planning Committee (LEPC). Worst-Case Release Scenario The worst-case release scenario submitted for Program Level 3, toxic substances as a class involves a catastrophic release from our chlorine handling system. Although allowed by the EPA, we did not consider any passive mitigation controls such as the rail car enclosure in calculating the scenario. By definition, the worst-case scenario could not include the use of the active prevention and mitigation systems developed by Clorox, which include sensors, alarms, emergency shutdown systems, air scrubbers and emergency response team. Alternative Release Scenario The alternative release scenario for our facility takes into account the passive and active mitigation controls. The EPA requires that a facility consider its release history in determining its alternative release scenario. This facility has not had any releases resulting in off-site consequences since startup of operations in 1953. However, a scenario with off-site consequences was developed by Clorox to comply with EPA requirements. This information has also been submitted to the EPA and to our LEPC. 4. The General Accidental Release Prevention Program and the Chemical-Specific Prevention Steps Our facility has taken all the necessary steps to comply with the accidental release prevention requirements set out under 40 CFR part 68 by the EPA. This facility was designed and constructed in accordance with NFPA-58 Standard, 1967 Edition. Our chlorine handling process is covered by the OSHA PSM standard under 29 CFR 1910.119. Our facility is also subject to the notification requirements of Section 302 of the Emergency Planning & Community Right-to-Know Act (EPCRA). Y2K Readiness All facility safety functions are tested routinely as part of our on-going safety programs and have been subje cted to additional testing for Y2K readiness. Clorox launched a comprehensive, company-wide Y2K program in 1997, with outside assessment conducted by Engineering Services Inc., a third-party Y2K engineering firm. Our facility manufacturing systems are designed with multiple safety features to avoid any problems that could be caused by failure of a specific device or control system. The automatic portion of our normal bleach facility operations are designed for "fail-safe" operation in the event of a control system failure or a power outage. Critical functions are additionally protected by battery back-ups. Finally, we have over-riding controls that are hard-wired to an emergency stop ("E-stop") system. This E-stop system is also designed for fail-safe operation, and it requires manual intervention to reset and start the system. With these layers of safety and back-up systems, and the testing we have completed on critical components, we believe our facility is prepared for Y2K. Process Safety Information Clorox maintains a detailed record of written safety information that describes the chemical hazards, operating parameters and equipment designs associated with all processes. Process Hazard Analysis Our facility conducts comprehensive studies to ensure that hazards associated with our processes are identified and controlled efficiently. The methodology used to carry out these analyses is a Hazardous Operability Studies (HazOps). The study is conducted by a team of qualified personnel with expertise in engineering and process operations. Per EPA and OSHA requirements, the HazOp is revalidated at least every five years or whenever the process is significantly changed. Any findings related to the hazard analysis are addressed in a timely manner. Operating Procedures For the purposes of safely conducting activities within our chlorine handling process, Clorox maintains written operating procedures. These procedures address various modes of operation such as startup, operations (normal and emergency), and shutdown. The information is regularly reviewed and is readily accessible to operators involved with the process. Training Clorox has a comprehensive training program in place to ensure that process operators are completely competent in the operating procedures associated with the process. New employees receive basic training in process operations followed by on-the-job supervision until they are deemed competent to work independently. Refresher training is provided annually or more frequently as needed. Mechanical Integrity Clorox carries out highly documented maintenance checks on process equipment to ensure proper functions. Process equipment examined by these checks includes among others; pressure vessels, storage tanks, piping systems, relief and vent systems, emergency shutdown systems, controls and pumps. The mechanical integrity of the welded pipe and fittings are verified by semi-annual ultrasonic test, annual high-pres sure nitrogen test and biannual X ray. Maintenance operations are carried out by qualified personnel with previous training in maintenance practices. Furthermore, these personnel are offered specialized training as needed. Any equipment deficiencies identified by the maintenance checks are corrected in a safe and timely manner. Management of Change Written procedures are in place at Clorox to manage changes in process chemicals, technology, equipment and procedures. Process operators, maintenance personnel or any other employee whose job tasks are affected by a modification in process conditions are promptly made aware of and offered training to deal with the modification. Pre-startup Reviews Pre-start-up safety reviews related to new processes and to modifications in established processes are conducted as a regular practice at Clorox. These reviews are conducted to confirm that construction, equipment, operating and maintenance procedures are suitable for safe start-up prior to placing equipment into operation. Compliance Audits Clorox conducts audits on a regular basis to determine whether the provisions set out under the RMP rule are being implemented. Although EPA required that these audits are conducted every three years, Clorox audits its chlorine-handling facilities annually. Corrective actions resulting from the audit findings are addressed in a safe and prompt manner. Incident Investigation Clorox promptly investigates any incident associated with the chlorine process, including false alarms and potential and actual releases of chlorine regardless of the quantity. These investigations are undertaken to identify the situation leading to the incident as well as any corrective actions to prevent the incident from reoccurring. All reports are retained for a minimum of five years. Employee Participation Clorox believes that process safety management and accident prevention are a team effort. Company employees are strongly encouraged to express the ir views concerning accident prevention issues and to recommend improvements. In addition, our employees have access to all information created as part of the facility's implementation to the RMP rule in particular information resulting from process hazard analyses. Contractors On occasion, our company hires contractors to conduct specialized maintenance and construction activities. Prior to selecting a contractor, a thorough evaluation of safety performance of the contractor is carried out. Clorox has a strict policy of informing the contractors of known potential hazards related the contractors work and the processes. Contractors are also informed of all the procedures for emergency response should an accidental release of chlorine occur. 5. Five-Year Accident History The Clorox Company has had an excellent record of preventing accidental releases over the last five years. Due to our stringent release prevention policies, there has been no accidental release as defined by th e EPA during this period at this facility or any similar Clorox facilities across the United States. Specifically, this facility has experienced no accidental releases resulting in off-site consequences since operations began in 1953. 6. Emergency Response Plan Clorox has developed and implemented a written emergency response plan to deal with accidental releases of hazardous materials. The plan includes all aspects of emergency response including adequate first aid and medical treatment, evacuations, notification of local emergency response agencies and the public, as well as post-incident decontamination of affected areas. To ensure proper functioning, our emergency response equipment is regularly inspected and serviced. Emergency drills are conducted at least quarterly to ensure that the system works as planned. In addition, the plan is promptly updated to reflect any pertinent changes taking place within our processes that would require a modified emergency response. The fa cility has coordinated its emergency plan with the Houston LEPC and the Houston Fire Department HAZMAT Team. 7. Planned Changes to Improve Safety Several developments and findings have resulted from the implementation of the various elements of our accidental release prevention program. Improved training, drills coordinated with local emergency responders, and new chlorine valves are some of the upgrades undertaken to improve safety at our facility before submitting our RMP. Upgrading the Chlorine Detector Logic Panel to version III is a major step we will be taking within the next year to improve safety at our facility. 8. Certification Statement The undersigned certifies that to the best of my knowledge, information, and belief, formed after reasonable inquiry, the information submitted is true, accurate and complete. Name: Dean Fisher Signature: __________________________ Title: Plant Manager Date: __________________________ |