Risk Management Plan  - EXECUTIVE SUMMARY 
 
Facility Policy: 
 
The management and employees operating each of our facilities are committed to the prevention of any accidental release of hazardous material transported or stored on our locations.  In the event an accidental release should occur, we are prepared to work with our Local Fire Company(s),  Emergency Response Personnel, and other appropriate authorities deemed applicable depending on the specific incident, to best mitigate any release and to minimize the impact of the release to people and the environment. 
 
Facility Information: 
 
The primary activity of our company is NAICS code 422510, "establishments primarily engaged in o 
perating country or terminal grain elevators", however we are also engaged  in providing "agricultural inputs" that include the receiving, storage, and reloading of Anhydrous Ammonia for delivery to farmers in our area.  The NAICS code we feel most applicable for receiving, storing, and reloading is # 493130 "farm product warehousing and storage". Anhydrous Ammonia is received, stored, and distributed for direct application to farm fields during the early and fall months.  During the balance of the year little if any product transfer occurs .  The maximum quantity stored in pressurized permanent storage vessels at the location described is   76,469    Lbs. The maximum on site vessel size is   18,000   Gallons, storing   76,000   Lbs.  The maximum quantity handled at a given time would be the off loading of a semi-trailer vehicle tank holding 40,000 to 42,000 lbs. 
 
The facility is operated on an "as needed" basis with staff present only during the receiving and reloading of product for  
delivery.  Total annual hours for these needs do not meet the 2,080 hour requirement to qualify as a "full time employee" on site, therefore item number 1.11 is Zero.  Our facilities have adequate lighting, and are inspected  at various times of day and night throughout the year.   Time expended for these inspections is not included in our staffing calculation. 
 
Worst-case release scenario: 
 
The "worst-case release scenario" is considered to be the release of the total contents of our largest Anhydrous Ammonia tank.  The maximum quantity released would be    76,000   Lbs.  based on 
85 % tank capacity as limited by design standards.   The distance to the endpoint (point of dispersion to 200 ppm) is    3.2    miles based on EPA's RMP -Comp Program (Version 1.06).  
 
 
 
Possible public and environmental receptors within the area has been provided to the County LEPC (Local Emergency Planning Committee) for their consideration.    
 
Alternative release scenario: 
 
There has not been an actual  
release of Anhydrous Ammonia during the last 5-years at the site.  We believe the most likely release would be caused by a break in a transfer hose.  Transfer hoses are protected by manual,  self closing excess flow , and "pull away" valves so our alternative release scenario is based on the loss of contents from the largest hose used (off loading transportation equipment).  The distance to the endpoint (point of dispersion to 200 ppm) is (Urban) 0.06  miles (317 feet) rounded to 0.1 mile (528 feet) per instructions by EPA guidance. 
 
Accidental Release Program: 
 
Our Anhydrous Ammonia accidental release program is based on guidelines found in the American National Standards Institute, Inc. (ANSI) standard K-61.1 "Safety Requirements for the Storage and Handling of Anhydrous Ammonia; and the U.S. Occupational Safety and Health Administration (OSHA) standard 29CFR 1910.111 "Storage and Handling of Anhydrous Ammonia".   We conduct annual employee training on the safe handling, transportati 
on and distribution of Anhydrous Ammonia, and have installed safety equipment including, but not limited to: Excess flow valves,  Breakaway couplers at risers,  Emergency shut-off valves,  Barriers to avoid damage by trucks or other vehicles, and Lock outs to prevent tampering when the site is unattended.   We also maintain routine contact with our local fire department and emergency response personnel; and have provided and/or participated in safety training exercises on Anhydrous Ammonia.  We have developed an Emergency Action Plan for employees, customers, and visitor protection in event of fire, explosion, tornado, and other acts of god that initiates evacuation, emergency medical care, contacts for assistance, etc. for all areas of our company including the Anhydrous Ammonia facility included in this plan.  The primary emergency coordinator is listed in the Registration Section of this document.  Any of the following additional individuals may be contacted in the event the primary 
emergency coordinator cannot be reached: 
 
              Name                                            Work Phone                   24-Hr. Phone 
 
             Gordon Mauch                              308-425-6211              308-425-9936    
 
             Daren Saathoff                             308-425-6211               308-425-9935   
 
Five - Year Accident History: 
 
There has not been a release of Anhydrous Ammonia within the past five years that has caused any death, injuries, or significant property damage at the facility; nor to our knowledge have resulted in offsite deaths, injuries, evacuations, sheltering in place, property damage, or environmental damage. 
 
 
Emergency Response Program: 
 
This facility is included in the written Community Emergency Response Plan as prepared by  the Local Emergency Planning Committee (LEPC), and the Nebraska Emergency Management Agency (NEMA) (former Nebraska State Civil Defense Agency).  We also include these materials in our own Emergenc 
y Action Plan in accordance with OSHA Standard 29CFR 1910.38.   We have provided State and Local authorities all Community Right-to-Know information requested as well as that required under SARA Title III  (EPCRA).  Our written employee safety programs include pre-emergency planning and employee training in accordance with OSHA standards, and are offered for review at any time by our Local Emergency Planning Committee (LEPC) to ensure they conform to the community plan(s).  We actively encourage participation in our Anhydrous Ammonia and Propane training programs by the local fire department(s), local emergency response team, community planners, etc. that may be expected to respond to an incident at our site.   
 
Planned changes to improve safety: 
 
Safety improvement is an on-going process at all of our facilities.  Periodic evaluations are performed to assess the maintenance of safe conditions.  There are no additional specific recommendations for implementation at this time.  
 
Additio 
nal Information: 
 
For  additional information, response to questions, or comments,  please contact:       
 
 
General Manager      at      308-263-2441   . 
 