EXECUTIVE SUMMARY 
 
RMP EXECUTIVE SUMMARY 
FROM RMP*SUBMIT FILE FOR SUBMISSION TO THE EPA 
 
1.    Corporate Prevention and Emergency Response Approach 
 
The Magnolia Water Treatment Plant is owned by the City of Winter Park.  The facility has developed and maintains accident prevention programs and an emergency response plan to prevent and mitigate the effects of hazardous chemical releases. 
 
2.    Description of Stationary Source 
 
The Magnolia Water Treatment Plant is located adjacent to a residential area at 1960 Magnolia Avenue, in Winter Park, Orange County, Florida.  Winter Park uses chlorine as a disinfectant for water treatment process. 
 
Liquefied chlorine gas is stored in up to five one-ton containers at the chlorination process building.  Two one-ton containers are always connected to the process, while up to three additional containers are stored adjacent to the connected containers.  The total chlorine inventory in the process at any one time is 10,000 lbs.  This is greater than the 2 
,500 lb. RMP threshold quantity for chlorine.  This process is not enclosed in a building, but sheltered with a three-sided building. 
 
3.    Description of the Worst-Case and Alternative Release Scenarios 
 
The Worst-Case release scenario is the rupture of a one-ton container from the chlorination process, releasing 2,000 lbs. of chlorine gas over a 10-minute period.  Under worst-case weather conditions, the chlorine gas could travel 1.3 miles before dispersing enough to no longer pose a hazard to the public or environment (reaching a concentration less than .0087 mg/L), using the WWTP Guidance look-up tables. 
 
The Alternative Release scenario is characterized by a release of liquid chlorine due to a failure of the liquid supply valve connection from worker/human error, external impact, or corrosion.  For the chlorination (Chlorine) process, the release rate was determined to be 251 lbs/min.  Under normal expected weather conditions, the chlorination process chlorine gas could travel 0.3 m 
iles before dispersing enough to no longer pose a hazard to the public or environment (reaching a concentration less than .0087 mg/L), using the WWTP Guidance look-up tables. 
 
4.    Prevention Program 
 
For the Clorination process, this facility exceeds the chlorine threshold quantity for the OSHA Process Safety Management (PSM) Standard, 1910.119.  For RMP compliance purposes, this places the Wymore Water Treatment Chlorination process in the Program 3 level.  The Magnolia  Water Treatment Facility will address all elements for the Prevention Program 3 as required by the RMP rule. 
 
The Magnolia Plant has a program in place to comply with the OSHA Process Safety Management Standard, 29 CFR 1910.119.  The PSM Program was created in 1999.  The PSM Program includes written operating procedures for the chlorination process.  These procedures cover all phases of operation and include information on worker protection.  These procedures will be used to train all operators and mechanics who work o 
n the chlorination and dechlorination processes to ensure consistency of operation and minimize human error.  The PSM Program also includes a preventative maintenance plan which requires all chlorination equipment to be periodically inspected and serviced.  This will ensure that the equipment remains in good operation condition and will minimize the probability of accidents due to faulty equipment.  Safe work practices, such as Lockout/Tagout and Hot Work Permit, have long been required by the City of Winter Park.  These will be reviewed and updated to ensure that all non-routine work can be performed safely.  Other components of the Prevention Program include the collection and review of all equipment information and the development of updated Piping & Instrumentation Diagrams (P&IDs).  These actions will ensure that the equipment meets all chlorination and wastewater industry standards and that accurate equipment information will be available when needed.  Other PSM procedures, inclu 
ding Management of Change, Pre-Startup Safety Review, Compliance Audits, and Incident Investigation will also be incorporated into this program to ensure continued safe operation and prompt correction of deficiencies.  The PSM Program receives full support of plant management and involvement of employees at all levels. 
 
5.    Accident History 
 
The Magnolia  Water Treatment Plant has had no accidental releases of chlorine in the past five years. 
 
6.    Emergency Response Program 
 
The Magnolia  WTP has an Emergency Response Plan in place.  The program complies with 29 CFR 1910.38.  The site also has some internal emergency response capability and has a procedure for addressing small releases of chlorine.  The current plan has been coordinated with the Winter Park and Orange County Fire Department and the Regional Local Emergency Planning Committee.  Notification is made locally by dialing 911 and by notifying the Florida State Warning Point    .