Country Oven Bakery - Executive Summary

| Accident History | Chemicals | Emergency Response | Registration | Source | Executive Summary |

RM PLAN EXECUTIVE SUMMARY 
 
A.   Accidental Release Prevention and Emergency Response Policies 
 
Country Oven Bakery recognizes management's responsibility in protecting the public, its employees,  the environment, equipment and property.  The safety and health of all personnel are very important.  The control of accidents has been and will continue to be a basic responsibility of all personnel in the Bowling Green facility. 
 
To accomplish the company's goal in controlling accidental losses, the facility has established a Plant Safety Program.  The objectives of the Plant Safety Program are to: maximize safety performance, eliminate human suffering and the economic burden resulting from injuries and accidents and reduce losses associated with damage of property. 
 
One of the activities associated with the Plant Safety Program has been the development and implementation of accidental release prevention and emergency response programs which are designed to comply with OSHA's Process Safety  
Management (PSM) standard (Process Safety Management of Highly Hazardous Chemicals, 29 CFR 1910.119), and EPA's Risk Management Program (RM program) regulation (Risk Management Programs for Chemical Accidental Release Prevention, 40 CFR Part 68).  Mr. Richard Noall, Plant Engineer, is responsible for implementation of the Risk Management Program. 
 
The purpose of the accidental release prevention and emergency response programs is to prevent the occurrence, and minimize the consequences of significant releases of toxic substances as well as fires, explosions, and other types of catastrophic accidents.  Overall, these programs prevent accidental fatalities, injuries and illnesses, environmental impact and avoid physical property damage. 
 
The accidental release prevention and emergency response programs help prevent accidents because they focus on the rules, procedures, and practices which govern individual processes, activities, or pieces of equipment.  These rules are detailed and impro 
ved as necessary.  They are also communicated to and accepted by all employees at the facility. 
 
In addition to the Plant Safety Program, the Country Oven Bakery facility follows the following corporate and site-specific safety guidelines: 
 
Employee Handbook Plant Safety Rules 
Kroger Company Contractor Safety Rules 
Kroger Company Total Quality Initiative (TQI) Process 
Kroger Company Manufacturing Safety Key Element Assessment (KEA) & Management 
Kroger Company Behavioral Accident Prevention Process (BAPP) Steering Committee 
General Office (GO) Safety Inspection Program and Abatement Plans 
CARE (Caring and Responsible Employees) Program 
Pesticide Controls and Lab Safety Program 
Job Safety Analysis (JSA) departmental Program 
 
B.   Stationary Source and Regulated Substances Handled 
 
Country Oven Bakery is part of the Kroger Company.  The facility manufactures frozen dough products and bakery items.   It operates an ammonia refrigeration system to provide cooling and freezing capabilities.  
The amount of anhydrous ammonia (CAS #7662-41-7) contained in the system is in excess of 10,000 pounds.  The maximum inventory in the system is approximately 20,000 pounds.  Since an ammonia release from the system could pose a risk of offsite public and/or environmental impact and the system is regulated under the OSHA PSM standard (29 CFR 1910.119), the system is subject to the Program 3 requirements of the EPA's RM program. 
 
C.   Summary of Worst-Case and Alternative Release Scenarios 
 
The worst-case release scenario at the Country Oven Bakery facility involves the release of 11,894 pounds of ammonia over a 10 minute period due to the failure of the +20oF receiver.  This quantity represents the full capacity of the vessel, which is a conservative assumption as it could be at most 40% full under normal operating conditions.  Under worst-case weather conditions, ammonia could travel 1.2 miles before dispersing enough to no longer pose a hazard to the public. This distance has been ca 
lculated based on the method provided in EPA's Risk Management Program (40 CFR 68) Guidance for Ammonia Refrigeration. 
 
The worst-case release scenario is unlikely for the following reasons: 
 
The worst-case weather conditions which were used for this scenario are not typical; 
Industry standards were followed for the manufacture and quality control of the receiver;  
The receiver is located in an enclosed area that could help to contain such a release; 
The receiver is located in a low traffic area within the engine room which minimizes the possibility of  loss of containment due to vehicular impact (e.g., from forklifts etc.); 
Ammonia is not corrosive in this service and the vessel is relatively new; 
An ammonia detector which is tied to emergency agency alarms is located near the receiver in the engine room; 
Pressure safety valves limit operating pressure in the vessel; 
The facility has a preventive maintenance program in place to maintain the on-going integrity of vessels;  
The facility 
has a training program designed to ensure that the system is operated by qualified personnel; and, 
The facility emergency response procedures enable trained personnel to respond quickly to isolate any potential releases. 
 
The alternative release scenario at the Country Oven Bakery facility involves the release of 5,300 pounds of ammonia over a 5 minute period due to the failure of a 3/4" liquid line between the storage tank and the high pressure receiver.  Under alternative release weather conditions, ammonia could travel 0.2 miles before dispersing enough to no longer pose a hazard to the public.  This distance has been calculated based on the method provided in EPA's Risk Management Program (40 CFR 68) Guidance for Ammonia Refrigeration. 
 
The alternative release scenario is unlikely for the following reasons: 
 
Industry standards were followed for the manufacture and quality control of the liquid lines; 
 
Ammonia is not corrosive in this service; 
 
Most of the lines are elevated to min 
imize potential damage from traffic, fork lifts etc.; 
 
The facility has a preventive maintenance program in place to maintain the on-going integrity of the system; 
 
The facility has a training program designed to ensure that the system is operated by qualified personnel; and, 
 
The facility emergency response procedures enable trained personnel to respond quickly to isolate any potential releases by closing isolation valves in the liquid lines. 
 
D.   Description of the Accidental Release Prevention Program 
 
The prevention program consists of the following elements: 
 
Employee Participation: This program involves the employees in establishing and implementing the program.  Employees are also to be involved when a process hazard analysis is conducted.  The program also ensures that all employees have complete access to the program. 
 
Process Safety Information: Written information has been collected which enables the employees to identify and understand the potential hazards in the system. 
The written information includes the ammonia MSDS and a description of the design of the ammonia refrigeration system. 
 
Process Hazard Analysis (PHA): Formal studies using the What-If/Checklist Technique have been conducted to examine the system and identify potential hazards.  Any recommendations from the PHA are resolved to improve facility safety. 
 
Operating Procedures:  Written, detailed procedures have been developed which describe the steps which should be followed to safely operate the ammonia refrigeration system. 
 
Training: A training program has been developed which ensures that employees are trained on all aspects of the system and on the duties which they should perform to ensure the safe operation of the ammonia refrigeration system. 
 
Contractors: All contractors are screened and evaluated before they perform work on or near the ammonia refrigeration system.  The contractors are also periodically evaluated to ensure that they perform work by following safe work practices. 
 
 
Pre-Startup Safety Review: A pre-startup safety review is required for all new ammonia projects to verify that all safety programs are in place, training has been performed, and construction has been completed according to design standards before the project is put into use. A pre-startup safety review is also performed when the process safety information related to the system changes significantly. 
 
Mechanical Integrity:  This program ensures that the ammonia refrigeration systems are built and maintained using preventive maintenance procedures to minimize unexpected breakdowns or failures. 
 
Hot Work Permit: These procedures ensure that a signed permit is obtained prior to any cutting, welding, or burning. 
 
Management of Change: Procedures are designed to ensure that all changes made to the ammonia refrigeration system are properly reviewed.   
 
Incident Investigation: The procedures ensure that any incidents (and near misses) are investigated, reviewed, and documented using an inves 
tigation team. Any recommendations from the investigation are resolved to improve facility safety. 
 
Compliance Audits: There are procedures to conduct regular audits of the RM prevention program to ensure that the program is in place and working properly.  Any recommendations from the audit are resolved to improve the prevention program. 
 
E.   Five-Year Accident History 
 
There have been no ammonia-related incidents at the Country Oven Bakery within the last five years that have resulted in onsite or offsite impacts. 
 
F.   Description of the Emergency Response Program 
 
An emergency response program has been implemented at the Country Oven Bakery facility.  This program contains procedures describing how the facility will respond to ammonia spills and other emergencies, including evacuation procedures.  The program has been coordinated with the Bowling Green Fire Department. 
 
The emergency response program consists of the following elements: 
 
Organization Plan and Responsibilities 
Commun 
ications Procedures 
Detailed Action Plans 
First Aid Procedures 
Emergency Medical Treatment Procedures 
Evacuation Plans 
Description of Outside Assistance Available 
Site Re-Entry Procedures 
Training Programs and Drills 
Revision and Update Criteria 
 
 
 
G.   Planned Changes to Improve Safety 
 
The following changes are planned to improve safety conditions and  further strengthen the ongoing safety efforts at the Country Oven Bakery facility: 
 
replacement of two sections of older piping 
creation of forklift aisles to isolate pedestrian traffic 
"Shoes for Crews" Wagon - purchase of safety shoes for all staff 
continual support for the Behavioral Accident Prevention Process (BAPP) and the Safety Key Element Assessment (KEA) process.
Click to return to beginning