Source Identification
CPL Victoria Power Station |
Central Power and Light |
Central and South West |
Submission and Acceptance
Correction or Administrative Change |
|
1999-07-14 |
1999-07-09 |
2004-05-21 |
2001-01-26 |
Yes |
|
|
Yes |
Facility Identification
1000 0001 1998 |
TXD027177906 |
Dun and Bradstreet Numbers (DUNS)
Facility Location Address
1205 C South Bottom Street PO Box 2299 zip 77092 Victoria, TX 77901 |
Victoria County |
Facility Latitude and Longitude
|
|
|
|
Interpolation - Map |
Center of Facility |
EPA Default Map Value Latitude/Longitude
28.788333 |
-97.01 |
|
Center of Facility |
Owner or Operator
Central Power and Light |
3618815300 |
539 Carancahua zip 78401 |
PO Box 2121 zip 78403 |
Corpus Christi |
TX |
78401 |
|
|
|
United States (US) |
Person or Position Responsible for Part 68 (RMP) Implementation
John Wester |
Plant Manager |
Emergency Contact
John Wester |
Plant Manager |
3617884912 |
3615751212 |
|
Other Points of Contact
Local Emergency Planning Committee
Full Time Equivalent Employees
Covered By
OSHA Ranking
Last Safety Inspection
1998-03-03 |
State environmental agency |
Predictive Filing
Confidential Business Information (CBI)
Reportable Accidents
|