Chevron Phillips Chemical Company LP, Sweeny - Executive Summary

| Accident History | Chemicals | Emergency Response | Registration | Source | Executive Summary |

CHEVRON PHILLIPS CHEMICAL COMPANY LP 
SWEENY COMPLEX 
RISK MANAGEMENT PLAN EXECUTIVE SUMMARY 
 
ACCIDENTAL RELEASE PREVENTION AND RESPONSE POLICIES 
Chevron Phillips Chemical Company LP Sweeny Complex has a long-standing commitment to  
worker and public safety.  This commitment is demonstrated by the resources invested in  
accident prevention, such as training and consideration of safety in the design, installation,  
operation, and maintenance of our processes.  Our policy is to implement controls to prevent  
foreseeable releases of hazardous chemicals.  However, if a release does occur, our trained  
personnel will respond to control and contain the release.   
 
DESCRIPTION OF THE STATIONARY SOURCE AND REGULATED SUBSTANCES 
Chevron Phillips Chemical Company LP Sweeny Complex consists of eight operating units linked by multiple pipelines.  The complex, near Old Ocean, Texas, is at the intersection of  
State Highway 35 and FM 524, about 60 miles southwest of downtown Houston.  The complex also  
operates a terminal and a storage facility, along with the pipelines that connect this  
facility to the main plant and its markets.  The complex produces 4.5 billion pounds of ethylene  
per year.  In our process, we use the following chemicals that EPA has identified as having the  
potential to cause significant offsite consequences in the event of a substantial accidental release: 
 
Toxics:  None 
 
Flammables:  Normal Butane, Ethylene, Propane, Propylene, Ethane, 2-Butene-trans, 1-Butene,  
2-Butene-cis, Butene, Isobutane, 2-Butene, Hydrogen, Isopentane, Methane, Pentane, 1,3- 
Butadiene, Propyne, Isoprene, 1-Pentene, Propadiene, 1,3-Pentadiene, 2-Pentene (E), Vinyl  
acetylene 
 
HAZARD ASSESSMENT RESULTS 
There are no toxic chemicals stored or used within the complex which are above the inventory  
limits as defined by the EPA.  For this reason, Chevron Phillips Chemical Company LP has no  
worst case (WCS) and alternate release scenarios (ARS) for toxic chemicals entered in this Risk Managem 
ent Plan.  
 
The WCS associated with flammable substances is a vapor cloud explosion (VCE) involving  
424,260 lbs of propylene from a fractionation column in Unit 33, an ethylene unit.  This  
WCS assumes the entire inventory of this vessel is released, vaporizes and ignites, resulting in a  
vapor cloud explosion.  Although there are several controls to prevent such releases and to  
manage their consequences, no credit for mitigation was taken into account in evaluating this  
scenario. The maximum distance to the 1 psi endpoint for this WCS is 0.6 miles (calculated using  
EPA's RMPComp).  This scenario has offsite impacts. 
 
The ACS associated with flammable substances is a VCE involving a release of NGL (Propane, ethane, N-butane, isobutane, isopentane, N-pentane, heptanes plus, hexanes, methane, and n-hexane) which may  
be caused by yielding the NGL pipeline flow (feed to Unit 10.2) through the flare stack to the  
atmosphere while the flare is unlit.  The modeling was based upon a relea 
se of 38,950 lbs. of  
NGL.  Credit for active mitigation was taken into account in evaluating this scenario which was  
operator intervention.   The maximum distance to the 1 psi (or lower flammable level) endpoint  
for this ACS is 0.3 miles (calculated using EPA's RMPComp).  This scenario has offsite impacts. 
 
 
GENERAL ACCIDENTAL RELEASE PREVENTION PROGRAM STEPS 
The following is a summary of the General Accidenal Releaset Prevention Program in place at the Chevron  
Phillips Chemical Company LP Sweeny Complex.  Because processes at the plant regulated by the  
EPA RMP regulation are also subject to the OSHA Process Safety Management (PSM) standard,  
this summary addresses each of the OSHA PSM elements and describes the management system  
in place to implement the Accidental Release Prevention Program.  
 
EMPLOYEE PARTICIPATION 
Sweeny Complex management encourages employees to participate in all facets of risk  
management and accident prevention.  Examples of employee participation range f 
rom updating  
and compiling technical documents and chemical information to participating as a member of a  
Process Hazard Analysis (PHA) team.  Employees have access to all information created as part  
of the Sweeny Complex?s Accidental Release Prevention Program.  Specific ways that employees can be  
involved in the Accidental Release Prevention Program are documented in the Employee Participation  
Element of the Sweeny Complex Process Safety Management System and in addition, Sweeny Complex has a number of teams to promote both process safety and personal safety.  The teams typically  
have members from various areas of the plant, including operations, maintenance, engineering  
and plant management.   
 
Three key areas for employee participation include the Employee Behavioral Safety Process  
(VIPER),  Employee Safety Committee (ESC), and the Voluntary Protection Program (VPP) recertification committee. 
 
PROCESS SAFETY INFORMATION 
Sweeny Complex maintains a variety of technical docume 
nts that are used in the safe operation  
of the processes. These documents address chemical properties and associated hazards, limits for  
key process parameters and specific chemical inventories, and equipment design  
basis/configuration information.  Specific departments within the complex are assigned  
responsibility for maintaining up-to-date Process Safety Information.  Process Safety  
Information reference documents are readily available as part of the written Employee  
Participation Plan to help employees locate any necessary Process Safety Information.   
 
Chemical-specific information, including exposure hazards and emergency response/exposure  
treatment considerations, is provided in material safety data sheets (MSDSs). For specific  
process areas, the complex has documented safety-related limits for specific process parameters  
(e.g., temperature, level, composition) in the unit-specific Process Safety Information (PSI)  
document.  The teams verify the process is maintained w 
ithin these limits using process controls  
and monitoring instruments, highly trained personnel and protective instrument systems (e.g.,  
automated shutdown systems).   
 
Sweeny Complex also maintains numerous technical documents that provide information about  
the design and construction of process equipment.  This information includes materials of  
construction, design pressure and temperature ratings, electrical rating of equipment, etc.  This  
information, in combination with written procedures and trained personnel, provides a basis for  
establishing inspection and maintenance activities, as well as for evaluating proposed process  
and facility changes to confirm that safety features in the process are not compromised.   
 
PROCESS HAZARD ANALYSIS 
Sweeny Complex has a comprehensive program to help ensure that hazards associated with the  
various processes are identified and controlled.  Within this program, each process is  
systematically examined to identify hazards and verify that  
adequate controls are in place to  
manage these hazards.   
 
Sweeny Complex primarily uses the HAZard and OPerability (HAZOP) analysis technique to  
perform these evaluations.  HAZOP analysis is recognized as one of the most systematic and  
thorough hazard evaluation techniques.  The analyses are conducted using a team of people who  
have operating and maintenance experience as well as engineering expertise.  This team  
identifies and evaluates hazards of the process as well as accident prevention and mitigation  
measures when the team believes such measures are necessary.  
 
The PHA Team findings are forwarded to local and corporate management for resolution.   
Implementation of mitigation options in response to PHA findings is based on a relative risk  
ranking assigned by the PHA team.  This ranking helps ensure that potential accident scenarios  
assigned the highest risk receive immediate attention.  All approved mitigation options being  
implemented in response to PHA team findings a 
re tracked until they are complete.  The final  
resolution of each finding is documented and retained.   
 
To confirm that process controls and/or process hazards do not deviate significantly  
from the original design safety features, Sweeny Complex periodically updates and revalidates  
the hazard analysis results. These periodic reviews are conducted at least every 5 years and will  
be conducted at this frequency until the process is no longer operating. The results and findings  
from these updates are documented and retained. Once again, the team findings are forwarded to  
management for consideration, and the final resolution of the findings is documented and  
retained. 
 
OPERATING PROCEDURES 
Sweeny Complex maintains written procedures that address various modes of process operations,  
such as (1) unit startup, (2) normal operations, (3) temporary operations, (4) emergency  
shutdown, (5) normal shutdown, and (6) initial startup of a new process. These procedures can be  
used as a refe 
rence by experienced operators and provide a basis for consistent training of new  
operators. These procedures are periodically reviewed and annually certified as current and  
accurate. The procedures are maintained current and accurate by revising them as necessary to  
reflect changes made through the Management of Change process. 
 
In addition, Sweeny Complex maintains a Process Safety Information document that provides  
guidance on how to respond to upper or lower limit exceedances for specific process or  
equipment parameters. This information, along with written operating procedures, is readily  
available to operators in the process unit and for other personnel to use as necessary to safely  
perform their job tasks. 
 
TRAINING 
To complement the written procedures for process operations, Sweeny Complex has  
implemented a comprehensive training program for all employees involved in operating a  
process. New employees receive basic training in plant operations if they are not already f 
amiliar  
with such operations. After successfully completing this training, a new operator is paired with a  
senior operator to learn process-specific duties and tasks. After operators demonstrate (e.g.,  
through tests, skills demonstration) that they have adequate knowledge to perform the duties and tasks  
in a safe manner, they can work independently. In addition, all operators periodically receive refresher training on the operating procedures to confirm their skills and knowledge are maintained at an acceptable level.  All of this training is documented for each operator, including the means used to verify that the operator understood the training. 
 
CONTRACTORS 
Sweeny Complex uses contractors as part of its regular work force during periods of increased  
maintenance or construction activities. Because some contractors work on or near process  
equipment, the plant has procedures in place to verify that contractors (1) perform their work in a  
safe manner, (2) have the appropriate kn 
owledge and skills, (3) are aware of the hazards in their  
workplace, (4) understand what they should do in the event of an emergency, (5) understand and  
follow site safety rules, and (6) inform plant personnel of any hazards that they find during their  
work. This is accomplished by providing contractors with (1) a Process Overview, (2)  
information about safety and health hazards, (3) Emergency Response Plan requirements, and (4)  
safe work practices prior to their beginning work. In addition, Sweeny Complex evaluates  
contractor safety programs and performance during the selection of a contractor. Plant personnel  
periodically monitor contractor performance to help ensure that contractors are fulfilling their  
safety obligations.  Contractors regularly participate in facility emergency drills. 
 
PRE-STARTUP SAFETY REVIEWS (PSSRs) 
Sweeny Complex conducts a PSSR for any new facility or facility modification that requires a  
change in the process safety information. The purpose of the  
PSSR is to confirm that safety features,  
procedures, personnel, and the equipment are appropriately prepared for startup prior to placing  
the equipment into service. This review provides one additional check to make certain construction  
is in accordance with the design specifications and that all supporting systems are operationally  
ready. The PSSR review team uses checklists to verify all aspects of readiness. A PSSR involves  
field verification of the construction and serves as a quality assurance function by requiring  
verification that Accidental Release Prevention Program requirements are properly implemented. 
 
MECHANICAL INTEGRITY 
Sweeny Complex has well-established practices and procedures to maintain pressure vessels,  
piping systems, relief and vent systems, controls, pumps and compressors, and emergency  
shutdown systems in a safe operating condition. The basic aspects of this program include:  
(1) conducting training, (2) developing written procedures, (3) performing ins 
pections and tests,  
(4) correcting identified deficiencies, and (5) applying quality assurance measures. In combination,  
these activities form a system that maintains the mechanical integrity of the process equipment. 
 
Maintenance personnel receive training on (1) an overview of the process, (2) safety and health  
hazards, (3) applicable maintenance procedures, (4) Emergency Response Plans, and  
(5) applicable safe work practices to help ensure they can perform their job in a safe manner.  
Written procedures confirm work is performed in a consistent manner and provide a basis for  
training. Inspections and tests are performed to verify equipment functions as intended, and to  
verify that equipment is within acceptable limits (e.g., adequate wall thickness for pressure  
vessels). If a deficiency is identified, employees will correct the deficiency before placing the  
equipment back into service (if possible), or an MOC Team will review the use of the equipment  
and determine what acti 
ons are necessary to verify the safe operation of the equipment. 
 
Another integral part of the Mechanical Integrity Program is quality assurance. Sweeny Complex  
incorporates quality assurance measures into equipment purchases and repairs. This helps ensure  
that new equipment is suitable for its intended use and that proper materials and spare parts are  
used when repairs are made. 
 
Sweeny Complex has developed a team-based defect elimination process known as TPM (Team  
Perfected Manufacturing).  The objective of this employee-driven process is to eliminate  
equipment failures through predictive and preventive maintenance.  As this process continues to  
mature, continuous and substantial improvement in operating reliability and safety is anticipated.  
 
SAFE WORK PRACTICES 
Sweeny Complex has long-standing safe work practices in place to help ensure worker and  
process safety. Examples of these include (1) control of the entry/presence/exit of support  
personnel, (2) a Lockout/Tagout Pr 
ocedure to verify isolation of energy sources for equipment  
undergoing maintenance, (3) procedures for safe removal of hazardous materials before process  
piping or equipment is opened, (4) a permit and procedure to control spark-producing activities  
(i.e., hot work), (5) a permit and procedure to confirm adequate precautions are in place before  
entry into a confined space, and (6) a Safety and Emergency Systems Bypass Permit procedure.  
These procedures and others, along with training of affected personnel, form a system to help  
ensure that operations and maintenance activities are performed safely. 
 
MANAGEMENT OF CHANGE 
Sweeny Complex has a comprehensive system to manage change. This system requires that  
changes to items such as process equipment, chemicals, technology (including process operating  
conditions), procedures, and other facility changes be properly reviewed and authorized before  
being implemented. Changes are reviewed to (1) verify adequate controls are in place to 
manage  
any new hazards and (2) verify that existing controls have not been compromised by the change.  
Affected chemical hazard information, process operating limits, and equipment information, as  
well as procedures, are updated to incorporate these changes. In addition, operating and  
maintenance personnel are provided any necessary training on the change. 
 
INCIDENT INVESTIGATION 
Sweeny Complex promptly investigates all incidents that resulted in, or reasonably could have  
resulted in, a fire/explosion, toxic gas release, major property damage, environmental loss, or  
personal injury. The goal of each investigation is to determine the Root Cause and develop  
corrective actions to prevent a recurrence of the incident or a similar incident. The investigation  
team documents its findings, develops recommendations to prevent a recurrence, and forwards  
these results to plant management and respective Teams for resolution.  Corrective actions taken  
in response to the investigation team 
?s findings and recommendations are tracked until these actions have been resolved. The final resolution of each finding or recommendation is documented, and the  
investigation results are reviewed with all employees (including contractors) who could be  
affected by the findings.  Incident investigation reports are retained for at least five years in order  
for these reports to be available for review during future PHAs and PHA revalidations. 
 
COMPLIANCE AUDITS 
Sweeny Complex periodically conducts compliance audits that include the following:  Internal PSM and RMP Audits; Designated Self Audits (Safety and Health); and Process for Safety and Environmental Excellence (PSEE) Evaluations.  Audit teams comprised of both hourly and management personnel conduct these audits. Audit findings are developed and presented to management for resolution.  All responses to audit findings are tracked until resolution.  All audits are retained for at least five years. 
 
RISK MANAGEMENT PROCESS 
In addit 
ion to the OSHA PSM elements described above, Sweeny Complex incorporates the elements of Chevron Phillips' Process for Safety & Environmental Excellence and OSHA?s  
Voluntary Protection Program in the Safety and Health process of the facility.  The elements of these two management processes include the following: 
 
OSHA VPP ELEMENTS 
(VOLUNTARY PROTECTION PROGRAM) 
PSEE ELEMENTS 
(PROCESS FOR S/E EXCELLENCE) 
 
 
VPP (1) MANAGEMENT COMMITMENT  
AND PLANNING 
PSEE (1) ROLES AND RESPONSIBILITIES 
VPP (2) ACCOUNTABILITY SYSTEMS 
 
PSEE (2) TRAINING 
VPP (3) DISCIPLINARY PROGRAM 
 
PSEE (3) INDUSTRIAL HYGIENE & HEALTH 
VPP (4) INJURY RATES 
 
PSEE (4) EMPLOYEE OWNERSHIP 
VPP (5) EMPLOYEE PARTICIPATION 
 
PSEE (5) BEHAVIOR MODIFICATION 
VPP (6) SELF INSPECTIONS 
 
PSEE (6) STANDARDS & PROCEDURES 
VPP (7) EMPLOYEE HAZARD REPORTING  
SYSTEMS 
PSEE (7) ENGINEERING DESIGN 
VPP (8) ACCIDENT/INCIDENT  
INVESTIGATION 
 
PSEE (8) MEASUREMENT 
VPP (9) JSA/PROCESS REVIEW 
 
PSEE (9) AUDITS 
VPP (10) SAFETY & HEALTH TRAINING 
 
 
PSEE (10) CONTRACTOR PERFORMANCE 
VPP (11) PREVENTATIVE MAINTENANCE 
 
PSEE (11) INCIDENT INVESTIGATION 
VPP (12) EMERGENCY PROGRAMS/DRILLS 
 
PSEE (12) RISK MANAGEMENT 
VPP (13) PERSONAL PROTECTIVE  
EQUIPMENT 
 
PSEE (13) MECHANICAL & OPERATING  
INTEGRITY 
VPP (14) HEALTH PROGRAMS 
 
PSEE (14) COMMUNITY INVOLVEMENT 
VPP (15) SAFETY & HEALTH STAFF  
INVOLVED WITH CHANGES 
PSEE (15) REGULATORY ASSESSMENT AND  
ADVOCACY 
VPP (16) CONTRACTOR SAFETY 
 
PSEE (16) PRODUCT STEWARDSHIP 
VPP (17) MEDICAL PROGRAM 
 
PSEE (17) POLLUTION PREVENTION 
VPP (18) SAFETY AND HEALTH STAFF  
                      RESOURCES 
 
VPP (19) ANNUAL EVALUATION 
 
CHEMICAL-SPECIFIC PREVENTION STEPS 
The processes at Sweeny Complex have hazards that must be managed to help ensure continued  
safe operation.  The Accidental Release Prevention Program summarized previously is applicable to all EPA  
RMP covered processes at the facility.  Collectively, these prevention program activities help prevent  
potential accident scenarios that co 
uld be caused by (1) equipment failures and (2) human errors. 
 
In addition to the Accidental Release Prevention Program activities, Sweeny Complex has safety features  
on many processes to help (1) contain/control a release, (2) quickly detect a release, and (3)  
reduce the consequences of (mitigate) a release.  The following types of safety features are used  
in various processes: 
 
Release Detection 
 
Gas Detectors (Hydrocarbon) with Alarms 
 
Release Containment/Control 
 
Process Relief Valves that discharge to a flare to capture and incinerate episodic releases 
Valves to permit isolation of the process (manual or automated) 
Automated Shutdown Systems for specific process parameters (e.g., high level, high  
temperature, release detection) 
Redundant equipment and instrumentation (e.g., uninterruptible power supply for process  
control system, backup firewater pump) 
Atmospheric Relief Devices 
Structural/Equipment Fire Proofing 
Relief Valve Maintenance Procedures 
 
RELEASE MITIGATION 
Fire Su 
ppression and Extinguishing Systems 
Deluge System for specific equipment 
Trained Emergency Response Personnel 
Personal Protective Equipment (e.g., protective clothing, self-contained breathing apparatus) 
Control Building is located outside of potential release areas 
Water curtains for specific equipment 
Siting and Spacing Initiative 
Emergency Isolation Valves 
Emergency Activation System 
Risk Based Inspection 
 
FIVE-YEAR ACCIDENT HISTORY 
During the past five years there has been one release of a regulated substance that required sheltering in place.  And one accident which had property damage impacts.  Every incident is  
carefully investigated to determine ways to prevent similar incidents from recurring.   
 
EMERGENCY RESPONSE PROGRAM INFORMATION 
Sweeny Complex maintains a written Emergency Response Program which is in place to protect  
worker and public safety as well as the environment. The program consists of procedures for  
responding to a release of a regulated substance, including  
the possibility of a fire or explosion if  
a flammable substance is accidentally released. The procedures address all aspects of emergency  
response, including the following: proper first-aid and medical treatment for exposures; evacuation plans and accounting for personnel after an evacuation; notification of local emergency response agencies  
and the public if a release occurs; and post-incident cleanup and decontamination requirements.  
In addition, Sweeny Complex has procedures that address maintenance, inspection, and testing  
of emergency response equipment, as well as instructions that address the use of emergency  
response equipment. Employees receive training in these procedures as necessary to perform  
their specific emergency response duties. The Emergency Response Program is updated when  
necessary based on modifications made to plant processes or other plant facilities. The  
Emergency Response Program changes are administered through the MOC process, which  
includes inform 
ing and/or training affected personnel in these changes. 
 
The overall Emergency Response Program for Sweeny Complex is coordinated with the Brazoria  
County Local Emergency Planning Committee (LEPC).  This coordination includes periodic  
meetings of the committee, which includes local emergency response officials, local government  
officials, and industry representatives. Sweeny Complex has around-the-clock communications  
capability with appropriate LEPC officials and emergency response organizations (e.g., fire  
department). This provides a means of notifying the public of an incident, if necessary, as well as  
facilitating quick response to an incident. In addition to periodic LEPC meetings, Sweeny  
Complex conducts periodic emergency drills that involve the LEPC and emergency response  
organizations.  In addition to the LEPC, the Sweeny Complex also has a Mutual Aid System in  
place.  The Emergency Assistance Agreement Committee (EAAC) is a sub-committee of the  
Industrial CAER org 
anization in the Brazosport area.  This system provides Mutual Aid from  
other industry members in the Brazosport area.  In addition, the Brazoria Volunteer Fire  
Department and West Brazos Emergency Medical Service would provide assistance in the event  
of an emergency at the Sweeny Complex.  The EAAC conducts emergency drills quarterly each  
year, hosted by a facility with the other member facilities participating. 
 
PLANNED CHANGES TO IMPROVE SAFETY 
Ongoing Facility Siting and Spacing Analysis 
Area Process and Perimeter Detection Analysis and installation 
Relief Valve and Relief Header Analysis and re-engineering 
Foundation of the HES employee excellence team 
VPP recertification 
Alarm management 
Work permit training 
Environmental awareness training 
 
PERMITS, EXEMPTIONS AND 
GENERAL DOCUMENTATION 
 
UNIT 10ABC 
Exemption No. X-3978  11-24-82 TACB Exemption for Debutanizer 
 
UNIT 10D 
Permit No. R-3073  1-18-77  TACB Operating Permit for Amine  
Regeneration Unit No. 3 
 
UNIT 12 
Permit No. 226 
90  4-12-96  TNRCC Permit Alteration 
Ethylene Area Revisions 
Permit No. 22690  4-19-95  TNRCC Ethylene Area Permit Amendment 
 
UNIT 18 
Permit No. 3040A  4-3-92  TACB permit No. 3040A Revision 
MAERT Correction 
Permit No. R-3040A  3-9-92  TACB Permit No. R-3040 Renewal for  
Polymer Grade Propylene Production and  
MA ERT Corrections 
Permit No. R-3040  1-4-77  TACB Operating Permit for Polymer Grade  
Propylene Production 
Permit No. C-3040  2-27-75  TACB Permit No. C-3040 
Polymer Grade Propylene Production Facility 
 
UNIT 22 
Permit  No. 22690  4-12-96  Permit Alteration 
Permit No. 22690  4-19-95  TNRCC Ethylene Area Permit Amendment 
Permit No. 22690  3-8-94  TNRCC Operating Permit for Ethylene Unit 22 
Permit Requirements  12-8-82  TACB Construction Renovation for Eight Furnaces 
 
UNIT 24 
Exempt. No. 39026  8-27-98  Exemption Registration No. 39026 
DAC Hydrotreater Revamp 
Permit No. 22690  4-12-96  TNRCC Permit Alteration Ethylene Area Revisions 
Permit No. 22690  4-19-95  TNRCC Ethylene Area Pe 
rmit Amendment (See Unit 22) 
 
UNIT 33 
Permit No. 22690  4-12-96  TNRCC Permit Alteration Ethylene Area Revisions 
Permit No. 22690  4-19-95  TNRCC Ethylene Area Permit Amendment (See Unit 22) 
Permit No. PSD-TX-751M1  3-28-91  TACB Permit No. PSD-TX-751 Modification for Ethylene Unit