Agriliance Grant Ne - Executive Summary

| Accident History | Chemicals | Emergency Response | Registration | Source | Executive Summary |

EXECUTIVE SUMMARY 
Agrilianc 
GRANT, NE TERMINAL 
 
 
Agriliance Grant, NE, fertilizer facility is located on nearly 10 acres in southwestern Nebraska, about 17 miles from the Colorado border.  The terminal functions as a mixing, storage and distribution facility for the fertilizer used by Farmland's 600,000 producer-members to grow the crops that provide high-quality, low-cost food for families around the world. 
 
Facility snapshot 
 
Annual volume of 2,250 tons of ammonia, used primarily in mixing, and 56,000 tons of liquid fertilizer is distributed through this Agriliance facility that has been supplying co-ops in western Nebraska for 25 years  The Grant facility provides a vital link in the chain of Farmland inputs  Anhydrous ammonia, produced at Farmland's nitrogen manufacturing facilities, is shipped to the Grant facility where it is used to make starter fertilizers for local co-ops By eliminating much of the shipping costs for the co-ops, the terminal helps contain the cost of fertiliz 
er for Farmland member-owners as well as provide a convenient location for them to get their product. 
 
Impact on the community 
 
Agriliance is a solid, reliable member of the Grant community.  Its employees are committed to customer service and the facility is available to service member-owners as needed throughout the year.  Agriliance Grant employees know their customers are also their neighbors and strive to "always be there if someone needs us" 
 
Employee snapshot 
 
Agriliance has five full-time  employees with more than 25 years of combined operating experience at its Grant facility.  Although few in number, these employees have a large impact on the community in which they live.  They have conducted facility tours for the local schools as well as the Local Emergency Planning Committee. 
 
Agriliance employees recognize community involvement and volunteerism as the most effective way to improve the communities they live in 
 
 
 
Pollution Prevention Policy 
 
Agriliance., is committed to pr 
otecting the environment and preserving our natural resources for future generations.  We pledge to eliminate or reduce our use of toxic substances and minimize our use of energy and the generation of all wastes to the extent technically and economically feasible.  We strive to prevent the generation of pollution at the source, but, where that cannot be achieved, we are committed to environmentally sound methods of recycling, treatment and disposal.  By preventing pollution at the source, we strive to achieve cost savings, increase operational efficiencies, improve the quality of our products and services, maintain a safe and healthful workplace and improve the environment. 
 
Risk Management Program 
 
This facility is subject to the Environmental Protection Agencies Risk Management Program Rule under the Clean Air Act Amendments of 1990.  The Risk Management Program Rule require facilities handling threshold amounts of certain substances to develop a  Risk Management Program and submit a 
Risk Management Plan.  The Program requirements include submission of the risk management plan, hazard assessments defining possible off-site impacts of certain regulated substance release scenarios, a five-year accident history,  development of a process accidental release prevention program, and an emergency response program. 
 
The following is the Executive Summary of the Risk Management Program for Farmland Industries, Inc;  Grant Fertilizer Terminal at Grant, Nebraska. 
 
Stationary Source and Regulated Substances 
 
Initial construction and operation of the Grant Fertilizer Terminal began in 1974.  Several changes, additions and improvements since that time have resulted in the current design of the facility.  The anhydrous ammonia received and stored at this facility is used in the formulation of liquid fertilizers. 
 
The Grant Fertilizer Terminal is a distribution facility for liquid fertilizers consisting of (2) 30,000,and  (1) 12,000 gal pressurized ammonia storage vessel, 10-34-0 
0 reactor, cooling tower, assorted liquid fertilizer storage tanks, miscellaneous vessels and piping. Ammonia is deliveried to the facility by rail car. 
 
Anhydrous Ammonia is the only substance, regulated by the EPA's RMP rule, that is used, or stored at the Grant's facility. The ammoina storage and 10-34-00 mixing process is subject to the rule as a program 3 process. 
 
Accidental release prevention and Emergency Response Policy 
 
It is Agriliance's corporate policy to eliminate accidental releases of any substance, in particular hazardous and regulated materials.  The management and employees of this facility are committed to the prevention of any accidental releases.  Accidental release prevention is critical to the safe operation of this terminal, the safety of its employees and the community. 
 
To achieve its accident and accidental release prevention goals, Agriliance is committed to the following: 
 
* A knowledgeable, motivated and highly trained employee group 
* A well-designed fac 
ility that is maintained and operated in a superior manner 
* Implementation of a Comprehensive Process Safety Management and Prevention Program 
* Continual review and improvements that enhance safety and accident prevention 
* Excellence in safety programs and practices, and a superior safety and accident record 
* Planning, preparation and training for emergency response 
 
The Grant terminal has had a written Emergency Response Plan, as required by the RMP and other EPA and Occupational Safety and Health Administration (OSHA) rules, in effect for many years, and is committed to implement the plan in response to any accidental release to minimize the impact to employees, the community and the environment.  The response plan is coordinated with the Local Emergency Response committee and emergency response agencies.  Terminal personnel have interacted with these agencies for many years regarding the plan and activities at the terminal.  The local emergency planning commitee represenatives h 
ave visited and toured the facility 
 
Employees are trained in the implementation of the plan and appropriate response activities that could be required in the event of an emergency. 
 
Prevention program 
 
The Grant fertilizer terminal is subject to the OSHA Process Safety Management (PSM) rule, 29CFR1910.119.  This rule has required this facility to establish an accident prevention program which is equivalent to that required for Program 3 processes under the EPA's RMP rule. 
 
The OSHA PSM/EPA Prevention Program consists of a set of facility management policies and procedures that promote and recognize process safety and the prevention of accidents in processes that handle, use, store or process hazardous materials.  The procedures provide accident prevention process controls to all aspects of this process activities. 
 
The Grant terminal adheres to the requirements of PSM and has written policies and procedures addressing all aspects of PSM and EPA Prevention Program requirements includin 
g routine training and testing of employees and drivers that operate any part of the process.   The facility has addressed the elements of accident prevention included in these programs throughout its years of operation. 
 
The facility is diligent in adhering to and maintaining its Process Safety/Prevention Program. 
 
Emergency Response Program 
 
The Grant Ammonia Terminal has established an Emergency Response Program and has a written Emergency Response Plan as required by the Risk Management Program rule and other Environmental Protection Agency and OSHA rules.  This plan is coordinated with the local community response plan and is available to those responding agencies.  The facility is included in the community emergency reponse plan. 
 
This facility is an active participant in the Local Emergency Planning Committee and interacts with various local agencies in its emergency planning.  These include local fire departments, law enforcement agencies and hospitals. 
 
Employees receive annua 
l training on the facility emergency response plan and also receive additional safety training, both in general, and in the competencies relative to their required roles in the emergency response plan. 
 
Five-year accident history 
 
The RMP rule requires inclusion of the facility's five-year accident history for all accidental releases of regulated substances that resulted in deaths, injuries or significant property or environmental damage on or off site.  
 
Agriliance's Grant terminal has an excellent five-year accident record with no RMP reportable releases. 
 
Hazard Assessment 
 
Synopsis of worst and alternative-case release scenarios: 
 
The hazard assessment element of the RMP rule requires the evaluation of potential off site effects of "worst-case" and "alternative-case" release scenarios of regulated substances in a program 3 process. 
 
The EPA has defined a worst-case scenario as the release of the largest quantity of a listed chemical from a vessel or proce                            
 
 
 
 
 
EXECUTIVE SUMMARY 
Agrilianc 
GRANT, NE TERMINAL 
 
 
Agriliance Grant, NE, fertilizer facility is located on nearly 10 acres in southwestern Nebraska, about 17 miles from the Colorado border.  The terminal functions as a mixing, storage and distribution facility for the fertilizer used by Farmland's 600,000 producer-members to grow the crops that provide high-quality, low-cost food for families around the world 
 
Facility snapshot 
 
Annual volume of 2,250 tons of ammonia, used primarily in mixing, and 56,000 tons of liquid fertilizer is distributed through this Agriliance facility that has been supplying co-ops in western Nebraska for 25 years  The Grant facility provides a vital link in the chain of Farmland inputs  Anhydrous ammonia, produced at Farmland's nitrogen manufacturing facilities, is shipped to the Grant facility where it is used to make starter fertilizers for local co-ops By eliminating much of the s 
hipping costs for the co-ops, the terminal helps contain the cost of fertilizer for Farmland member-owners as well as provide a convenient location for them to get their product 
 
Impact on the community 
 
Agriliance is a solid, reliable member of the Grant community.  Its employees are committed to customer service and the facility is available to service member-owners as needed throughout the year.  Agriliance Grant employees know their customers are also their neighbors and strive to "always be there if someone needs us." 
 
Employee snapshot 
 
Agriliance has five full-time  employees with more than 25 years of combined operating experience at its Grant facility.  Although few in number, these employees have a large impact on the community in which they live.  They have conducted facility tours for the local schools as well as the Local Emergency Planning Committee. 
 
Agriliance employees recognize community involvement and volunteerism as the most effective way to improve the communities 
they live in. 
 
 
 
Pollution Prevention Policy 
 
Agriliance., is committed to protecting the environment and preserving our natural resources for future generations.  We pledge to eliminate or reduce our use of toxic substances and minimize our use of energy and the generation of all wastes to the extent technically and economically feasible.  We strive to prevent the generation of pollution at the source, but, where that cannot be achieved, we are committed to environmentally sound methods of recycling, treatment and disposal.  By preventing pollution at the source, we strive to achieve cost savings, increase operational efficiencies, improve the quality of our products and services, maintain a safe and healthful workplace and improve the environment. 
 
Risk Management Program 
 
This facility is subject to the Environmental Protection Agencies Risk Management Program Rule under the Clean Air Act Amendments of 1990.  The Risk Management Program Rule require facilities handling threshold am 
ounts of certain substances to develop a  Risk Management Program and submit a Risk Management Plan.  The Program requirements include submission of the risk management plan, hazard assessments defining possible off-site impacts of certain regulated substance release scenarios, a five-year accident history,  development of a process accidental release prevention program, and an emergency response program. 
 
The following is the Executive Summary of the Risk Management Program for Farmland Industries, Inc;  Grant Fertilizer Terminal at Grant, Nebraska. 
 
Stationary Source and Regulated Substances 
 
Initial construction and operation of the Grant Fertilizer Terminal began in 1974.  Several changes, additions and improvements since that time have resulted in the current design of the facility.  The anhydrous ammonia received and stored at this facility is used in the formulation of liquid fertilizers. 
 
The Grant Fertilizer Terminal is a distribution facility for liquid fertilizers consisting 
of (2) 30,000,and  (1) 12,000 gal pressurized ammonia storage vessel, 10-34-00 reactor, cooling tower, assorted liquid fertilizer storage tanks, miscellaneous vessels and piping. Ammonia is deliveried to the facility by rail car. 
 
Anhydrous Ammonia is the only substance, regulated by the EPA's RMP rule, that is used, or stored at the Grant's facility. The ammoina storage and 10-34-00 mixing process is subject to the rule as a program 3 process. 
 
Accidental release prevention and Emergency Response Policy 
 
It is Agriliance's corporate policy to eliminate accidental releases of any substance, in particular hazardous and regulated materials.  The management and employees of this facility are committed to the prevention of any accidental releases.  Accidental release prevention is critical to the safe operation of this terminal, the safety of its employees and the community. 
 
To achieve its accident and accidental release prevention goals, Agriliance is committed to the following: 
 
* A kn 
owledgeable, motivated and highly trained employee group 
* A well-designed facility that is maintained and operated in a superior manner 
* Implementation of a Comprehensive Process Safety Management and Prevention Program 
* Continual review and improvements that enhance safety and accident prevention 
* Excellence in safety programs and practices, and a superior safety and accident record 
* Planning, preparation and training for emergency response 
 
The Grant terminal has had a written Emergency Response Plan, as required by the RMP and other EPA and Occupational Safety and Health Administration (OSHA) rules, in effect for many years, and is committed to implement the plan in response to any accidental release to minimize the impact to employees, the community and the environment.  The response plan is coordinated with the Local Emergency Response committee and emergency response agencies.  Terminal personnel have interacted with these agencies for many years regarding the plan and activ 
ities at the terminal.  The local emergency planning commitee represenatives have visited and toured the facility 
 
Employees are trained in the implementation of the plan and appropriate response activities that could be required in the event of an emergency. 
 
Prevention program 
 
The Grant fertilizer terminal is subject to the OSHA Process Safety Management (PSM) rule, 29CFR1910.119.  This rule has required this facility to establish an accident prevention program which is equivalent to that required for Program 3 processes under the EPA's RMP rule. 
 
The OSHA PSM/EPA Prevention Program consists of a set of facility management policies and procedures that promote and recognize process safety and the prevention of accidents in processes that handle, use, store or process hazardous materials.  The procedures provide accident prevention process controls to all aspects of this process activities. 
 
The Grant terminal adheres to the requirements of PSM and has written policies and procedures  
addressing all aspects of PSM and EPA Prevention Program requirements including routine training and testing of employees and drivers that operate any part of the process.   The facility has addressed the elements of accident prevention included in these programs throughout its years of operation. 
 
The facility is diligent in adhering to and maintaining its Process Safety/Prevention Program. 
 
Emergency Response Program 
 
The Grant Ammonia Terminal has established an Emergency Response Program and has a written Emergency Response Plan as required by the Risk Management Program rule and other Environmental Protection Agency and OSHA rules.  This plan is coordinated with the local community response plan and is available to those responding agencies.  The facility is included in the community emergency reponse plan. 
 
This facility is an active participant in the Local Emergency Planning Committee and interacts with various local agencies in its emergency planning.  These include local fire 
departments, law enforcement agencies and hospitals. 
 
Employees receive annual training on the facility emergency response plan and also receive additional safety training, both in general, and in the competencies relative to their required roles in the emergency response plan. 
 
Five-year accident history 
 
The RMP rule requires inclusion of the facility's five-year accident history for all accidental releases of regulated substances that resulted in deaths, injuries or significant property or environmental damage on or off site.  
 
Agriliance's Grant terminal has an excellent five-year accident record with no RMP reportable releases. 
 
Hazard Assessment 
 
Synopsis of worst and alternative-case release scenarios: 
 
The hazard assessment element of the RMP rule requires the evaluation of potential off site effects of "worst-case" and "alternative-case" release scenarios of regulated substances in a program 3 process. 
 
The EPA has defined a worst-case scenario as the release of the largest q 
uantity of a listed chemical from a vessel or proce                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    
Click to return to beginning