Buckeye Water Treatment Plant - Executive Summary

| Accident History | Chemicals | Emergency Response | Registration | Source | Executive Summary |

The City of Redding has instituted a Risk Management Program for their water treatment facility, Buckeye Water Treatment Plant, as required by Federal Accidental Release Prevention (ARP) Program regulations at 40 CFR Part 68.  The Risk Management Program identifies the equipment, procedures, maintenance, inspection, and training associated with Regulated Substances (RS's) handled at this facility in excess of Federal threshold quantities; describes the structured assessment of hazards which was conducted to assess possible effects on employees and offsite public and environmental receptors; provides the results of an offsite consequences analysis; defines a prevention program, emergency response program, and mitigation measures to reduce the probability and magnitude of accidental releases of RS's; and establishes a schedule and responsibilities for implementation of mitigation measures and auditing of program elements.  This Risk Management Plan (RMP) is being filed as required by ARP 
regulations in order to report the elements of the current Risk Management Program and to describe further measures planned to mitigate or prevent accidental releases of RS's.   
 
STATIONARY SOURCE AND REGULATED SUBSTANCES HANDLED 
 
The City of Redding operates two water treatment plants.  Its Buckeye Water Treatment Plant is located at 11501 Benson Road, Shasta, CA in Shasta County, and uses chlorine for disinfection in quantities greater than the Federal threshold quantity for this RS.  The facility is located on the Spring Creek Conduit north of the community of Shasta and west of Keswick in a rural area with few residences.  There are no full-time employees at this site.  Operators visit the site on a regular schedule and also respond to alarm conditions.  Chlorine is received in ton containers by truck, handled with an electric hoist, and stored on ton container scales and trunnion sets inside the building.  The chlorine is used to control biological growth on the filters and to di 
sinfect the treated water.  Pressurized chlorine gas within a ton container is reduced to vacuum at a vacuum regulator valve mounted directly onto the ton container's gas valve.  From there, the chlorine under vacuum is metered through rate valves and rotameters in chlorinators located in an adjacent room, and drawn into water solution by the passage of pressurized water through an injector. 
 
ACCIDENTAL RELEASE PREVENTION AND EMERGENCY RESPONSE POLICIES 
 
It is the policy of the City of Redding that the receipt, storage and handling of chlorine at its facility be done in a manner which meets regulatory requirements and minimizes the probability and severity of accidental releases of chlorine to the atmosphere, in order to protect the health and safety of its workers, the public, and the environment.  In order to accomplish this goal, City of Redding has gathered safety information on chlorine and on the process, equipment and procedures involving chlorine; performed a structured assessm 
ent of hazards of the process and external events which might affect the process; performed an offsite consequences analysis of defined release scenarios; established a written program for prevention and mitigation of accidental releases; and established a written emergency response program coordinated with emergency response agencies. 
 
WORST CASE RELEASE SCENARIO 
 
A single "worst case" release scenario is required to be considered for each stationary source, resulting in the maximum distance to an endpoint for all toxic RS's contained on site above the threshold quantity. 
The worst case release scenario for toxic chemicals is defined in the ARP regulations as the release of the contents of the largest single container of RS (in this case chlorine) over a period of 10 minutes. The scenario considered the release of the contents of the largest container of chlorine on site, in this case 2,000 lb.  This release scenario is not physically possible, due to the characteristics of chlorine. 
 
 
ALTERNATIVE CASE RELEASE SCENARIO 
 
An "alternative case" release scenario is required to be considered for each toxic RS handled in quantities greater than the threshold quantity at the site. 
The "alternative case" scenario is described in the ARP regulations as a likely release resulting in offsite effects, considering administrative controls and mitigation measures in place, and is to be determined by the facility operators as part of the Process Hazard Analysis required to be performed during RMP development.  The "alternative case" considered for this facility is the release of liquid chlorine from a pinhole in one of the fusible plugs on a received ton container, due to a supplier error or damage in transit, with the release secured by application of a Type "B" Ton Container Repair Kit fixture after 60 minutes. 
 
ADMINISTRATIVE CONTROLS 
 
Administrative controls in effect at the City of Redding which were considered to mitigate the severity of the Worst Case and Alternative Case re 
lease scenarios include the City of Redding's written policies and procedures for training of operators and maintenance personnel, written procedures for control of the inventory of chlorine at the facility, and policies regarding quality level of replacement materials and components for the chlorine system. 
 
MITIGATION MEASURES 
 
No mitigation measures were considered to limit the severity of the Worst Case scenario.  No passive mitigation measures were considered to limit the severity of the Alternative Case scenario.  Active mitigation was considered for the Alternative Case, in the form of the timely response of properly trained and equipped personnel following established emergency response procedures.. 
 
GENERAL ACCIDENTAL RELEASE PREVENTION PROGRAMS 
 
General accidental release prevention programs instituted by City of Redding are categorized as administrative (management) programs; procedures, training, and engineering controls; and emergency response programs. 
The City of Redding 
has instituted a Process Safety Management (PSM) Program meeting OSHA requirements at 29 CFR 1910.119 covering the disinfection process at its water treatment plants.  This constitutes the general accidental release prevention program for the City of Redding's operations.  The program and document management procedures included in the PSM Program will be used as the management system for the Risk Management Program. 
 
CHEMICAL-SPECIFIC RELEASE PREVENTION STEPS 
 
Release prevention steps specific to chlorine have been identified and implemented.  These include, among other things, installation of seismic restraints on the ton container scales. 
 
FIVE YEAR ACCIDENT HISTORY 
 
There have been no accidents involving chlorine at this facility within the past five years resulting in injuries or offsite consequences. 
 
EMERGENCY RESPONSE PROGRAM 
 
The City of Redding's Emergency Response Program applicable to chlorine has been coordinated with Redding Fire Department.  The City of Redding maintains 
HazMat emergency response capability with respect to chlorine releases at its facilities through a joint team of water and wastewater utility staff within the Public Works Department. 
 
PLANNED CHANGES TO IMPROVE SAFETY 
 
All of the improvements and mitigation measures identified in the process hazard analysis which City of Redding committed to accomplish have been completed or are in progress.  Any other measures identified by employees during workplace hazard surveys, or as a result of audit activities, will be thoroughly reviewed and considered for implementation.
Click to return to beginning