Bradford Street Water Well - Executive Summary

| Accident History | Chemicals | Emergency Response | Registration | Source | Executive Summary |

Orientation and General Overview: 
The City of Biloxi has nineteen (19) water well sites that are utilized to produce drinking water for the citizens and businesses of the City. Thirteen (13) of these water wells have two (2) cylinders each of liquid chlorine, each of which contains 2,000 pounds, for a total of 4,000 pounds of liquid chlorine at each well site. This RMP is for one of those thirteen (13) water well sites. 
 
ECO Resources, Inc. (ECO) is under contract with the City of Biloxi to operate and maintain the City's water production and distribution system, and its wastewater collection system. The City owns the utility facilities and is therefore responsible for the submission of this RMP; however ECO played an integral part in its preparation. ECO is a professional Contract Operations company that was established in Sugar Land, Texas in 1973. ECO operates and maintains water/wastewater utility systems for more than 140 clients in the states of Mississippi, Texas, California and 
New Mexico. 
 
 
Nature of Facility Risk Imposed and Risk Minimization: 
The primary facility risk to the public is that liquid chlorine could be released into the atmosphere as a toxic gas (a vapor). A total rupture of the chlorine cylinders or a total failure of the process equipment is highly unlikely; therefore a sudden and total release of all of the chlorine is also highly unlikely. The more likely scenario is the slow release of chlorine due to a leak of some type. Although great measures have been taken to prevent such leak event, such leak would result in the dispersal of chlorine gas to about .1 mile from the facility, according to the RMP*Comp Model, Version 1.06. To minimize this risk, numerous steps and measures have been taken and documented throughout this Executive Summary and the RMP. A specific example not noted in the RMP is the change-out of the chlorination system from pressure regulators to vacuum regulators, which is a far safer and more reliable system. 
 
 
RMP*Submi 
t  - Data Entry Explanations: 
Section 1.11 asks the question "Number of full time employees on site". The described facility is inspected every single day of the year by an ECO employee that holds a current and valid Waterworks Operator Certification as promulgated by the State of Mississippi Department of Health. Each daily inspection generally takes 20 to 30 minutes. The data field will not accept a "fraction of an employee" expressed in a decimal value. The EPA hotline attendant for the RMP program suggested that a "1" be entered in this data field and then explained with an entry in the Executive Summary, which this paragraph accomplishes. 
 
 
Below are summaries of selected elements of the RMP, as specifically requested in the RMP User's Manuals, Pages 2.1 through 2.2: 
 
Accidental Release and Prevention Emergency Response Policies: 
At this facility, chlorine is handled, which is considered by the EPA to be a hazardous material. The same qualities that make chlorine valuable as a com 
modity also make it necessary to observe certain safety precautions in handling chlorine to prevent unnecessary human exposure, to reduce the threat to the personal health of persons working with and around the chlorine, and to reduce the threat to nearby members of the community.  
 
As the contract operator for the City, it is the policy of both the City and ECO to adhere to all Federal and state rules and regulations. Safety depends upon the manner in which the chlorine is handled, the safety devices inherent in the design of the facility, the safe handling procedures that are used, and the training of personnel.  
 
The accidental release prevention and emergency response policies were modeled from various professional sources, such as the Chlorine Institute's Pamphlet 64, Emergency Response Plans for Chlorine Facilities, J. J. Keller and Associates, Inc.'s Keller-Soft Safety Plans, and OSHA documentation. 
 
 
Facility and the Regulated Substances Handled: 
Two (2) cylinders of liquid chl 
orine, containing 2,000 pounds each, are located at this facility, for a total of 4,000 pounds of liquid chlorine. 
 
The primary purpose of this facility is to distribute chlorine into the public water system in a safe and reliable manner that is in conformance with regulations as established by the Mississippi Department of Health, the Mississippi Department of Environmental Quality, and the U. S. Environmental Protection Agency. Two (2) cylinders are maintained at the facility to ensure a constant supply of chlorine when one of the tanks becomes empty. The chlorine is provided by a licensed and certified vendor and is delivered in vehicles that are in conformance with Department of Transportation regulations. 
 
A chain link fence that allows visibility secures this facility. This fence is chained and locked. There is also another chain link fence immediately surrounding the chlorine cylinders. It is also chained and locked. The grounds are mowed and maintained in such a manner that the 
facility is in full view and easily accessible by authorized personnel. The site is restricted to authorized facility employees, authorized management personnel and authorized contractors only. There are signs clearly posted (including a telephone number) for notification in the event of an emergency 
 
There are established written procedures for changing chlorine cylinders, as follows: 
 
                                  CHANGING A CHLORINE CYLINDER 
 
STEP 1:    Notify dispatch to advise your location and that you are changing a chlorine cylinder, and the size of the cylinder. 
 
STEP 2:    There must be two certified operators present to change a chlorine cylinder. 
 
STEP 3:    The operators must use Self-Contained Breathing Apparatus (SCBA) when changing chlorine cylinders. 
 
STEP 4:    Turn the well on manual to ensure that it remains running. Wait until the pump starts and the chlorine booster pump is running. 
 
STEP 5:    Turn the chlorine cylinder off. 
 
STEP 6:    Check the rotameter to ensure that it  
drops to zero and stays there. If the rotameter does not drop to zero, perform maintenance as needed on the poly tubing to ensure that the rotameter drops to zero. 
 
STEP 7:    With the well still running, slowly loosen the regulator. Do not take it off immediately. If no chlorine is released, remove the regulator yolk. 
 
STEP 8:    Check the valve on the new replacement cylinder to assure that it is off. Slowly loosen the valve cap on the replacement chlorine cylinder. Check for leaks using an ammonia solution. If there is a leak, tighten the cap to stop the leak and notify dispatch to notify the vendor to retrieve the cylinder and leave a replacement cylinder. If there is no leak, then remove the cap. Then clean the face of the valve outlet. 
 
STEP 9:    Remove the lead washer from the yolk. Clean the area and always use a new washer! 
 
STEP 10:    Put the yolk over the cylinder and tighten it. Make sure that the nipple fits properly in the socket. Do not over-tighten the nipple. 
 
STEP 11:    Open slow 
ly the cylinder valve and check for a leak. If there is a leak, close the valve and slightly tighten the yolk assembly. Then slowly open the valve and check again for a leak. Repeat this procedure until there is no leak. If there still is a leak and this procedure does not stop it, then tighten the cap to stop the leak and notify dispatch to notify the vendor to retrieve the cylinder and leave a replacement. 
 
STEP 12:    Turn the well back to the automatic mode. 
 
STEP 13:    Record in the daily logbook the date, time, personnel present and the maintenance performed. 
 
STEP 14:    Call dispatch to notify them that you have completed changing the cylinder. 
 
 
Worst -Case Scenario and Alternate Release Scenario: 
 
Worst-Case Scenario - Total failure of either or both cylinders is highly unlikely. However, if such an event did occur, then 4,000 pounds of liquid chlorine could be released into the atmosphere as a toxic gas (a vapor), which is heavier than air. According to the RMP*Comp Model, Version 1 
.06, the distance to the endpoint would be 1.9 miles. Based on guidelines as published by The Chlorine Institute, Inc., this scenario assumes a release rate of 400 pounds per minute for release duration of 10 minutes, wind speed of 3.4 miles per hour, air temperature of 77 degrees, air stability class F, no mitigation measures and urban surroundings. 
 
Alternate Case Scenario - A malfunction occurs during a cylinder change-out and there is a slow release of liquid chlorine into the atmosphere as a toxic gas (a vapor), which is heavier than air. Although also remote, this scenario was selected because it is probably the most likely incident to occur that would cause a release of chlorine gas. Based on guidelines as published by The Chlorine Institute, Inc., this scenario assumes a release rate of 10 pounds per minute for release duration of 400 minutes, wind speed of 6.7 miles per hour, air temperature of 77 degrees, air stability class D, no mitigation measures and urban surroundings. U 
nder this scenario, according to the RMP*Comp Model, Version 1.06, the distance to the endpoint would be .1 mile. 
 
 
General Accidental Release Program and Chemical-Specific Prevention Steps: 
This facility complies with the EPA's Accidental Release Prevention Rule and with all applicable state codes and regulations, including the rules and regulations as promulgated by the EPA, Mississippi Department of Health, Mississippi Department of Environmental Quality, and OSHA. The facility also follows guidelines as established by the American Water Works Association and the Chlorine Institute. 
 
 
Five Year Accident History: 
There have been no accidents to report at this facility within the last five years. 
 
 
Emergency Response Program: 
This facility's Emergency Response Program is based on the Chlorine Institute's Pamphlet 64, Emergency Response Plans for Chlorine Facilities. The program addresses the requirements of 40CFR 68 pertaining to notification, medical treatment, response procedures, p 
lanning, use and maintenance of emergency equipment, employee safety training, and emergency response evaluation. This program has been discussed, reviewed and coordinated with the City of Biloxi Fire Department. A representative of the City of Biloxi Fire Department visits the facility on an annual basis, at a minimum, to inspect the facility for fire prevention and overall safety. There is a formally designated and documented Chlorine Emergency Response Team (CERT). The team is highly trained, performs periodic practice drills, and is on notice 24 hours a day, 365 days a year. In the event of an emergency, the City of Biloxi Fire Department in cooperation with the City of Biloxi Police Department notifies the public.  
 
 
Planned Changes in Improved Safety: 
All Safety Manuals and all other safety related documents, are in the process of being updated and upgraded utilizing software produced by J. J. Keller and Associates, Inc. The software is entitled Keller-Soft Safety Plans.