EXECUTIVE SUMMARY 
 
The City of Weslaco Water Treatment Plant accidental release prevention policy involves a unified approach that integrates technologies, procedures, and management practices.  The Weslaco emergency response policy involves the preparation of a response plan that is tailored to each facility and to the emergency response services available in the community.  The policy adheres to EPA Prevention Program procedures where applicable, and is in compliance with EPA Emergency Response Program requirements.   
 
The City of Weslaco Water Treatment Plant is located at Mile 5 West and Mile 9 North, in Weslaco, Hidalgo County, Texas.  The chlorination building at the Water Treatment facility consists of a three walled canopy structure facing west that is located approximately in the middle of the facility. Six 1-ton cylinders of chlorine are stored in the facility.  Only two 1-ton containers are connected to the system at one time.  These are located inside the walled canopy str 
ucture.  One 1-ton cylinder is operational and the other one is used as backup.  The chlorine containers have manual shutoff valves in case of an emergency and a chlorine alarm will be triggered if a release occurs.  Emergency air supply and power are available.  The facility is manned 24-hours a day, and operators check the chlorination building daily.  Self-Contained-Breathing-Apparatus (SCBA) are stored in the office and workroom located approximately 100 ft. and 200 ft. away from the chlorination building, respectively.  
 
The offsite consequence analysis for the Water Treatment includes consideration of two different release scenarios for each of the parameters of concern (chlorine): 1) A "Worst Case Release"; and 2) an "Alternative Scenario".  The "Worst Case Release" is defined by EPA guidance which states that "the owner or operator shall assume that the ... maximum quantity in the largest vessel... is released as a gas over 10 minutes," due to an unspecified failure.  The Alter 
native Scenario is defined as "more likely to occur than the worst-case release scenario."  
 
Atmospheric dispersion modeling has to be performed to determine the distance traveled by a parameter of concern before its concentration decreases to the "toxic endpoint".  The toxic endpoints are defined by the EPA as 0.0087 mg/L for chlorine. These values correspond to the Emergency Response Planning Guidelines Level 2 (ERPG-2) concentrations which are defined by the American Industrial Hygiene Association (AIHA) as: 
 
" The maximum airborne concentration below which it is believed that nearly all individuals could be exposed for up to one-hour without experiencing or developing irreversible or other serious health effects or symptoms which could impair an individual's ability to take protection action."   
 
The estimated population potentially affected by the release is defined as the residential population within a circle with a radius corresponding to the toxic endpoint distance. 
 
The Worst 
Case Release Scenario at the Weslaco Water Treatment Plant was defined by the following conditions: 
 
Failure of 2 one-ton containers resulting in the total release of 4,000 pounds of chlorine; 
 
Release of the entire amount as a gas in 10 minutes; 
 
Use of the one-hour average ERPG-2 as the toxic endpoint; 
 
Consideration of the population residing within a full circle with radius corresponding to the toxic endpoint distance; and 
 
EPA mandated meteorological conditions, specifically an F atmospheric stability class, wind 
speed of 1.5 m/sec, and air temperature of 77:F. 
 
Atmospheric dispersion modeling for the Worst Case Release scenario resulted in a chlorine toxic endpoint distance of 1.3 miles and an estimated residential population potentially affected of 2,224. The calculations were performed with the CAMEO and RMPComp32 models as provided by USEPA and NOAA.  The affected population was estimated through Tiger and Landview III information. 
 
The Alternative Release Scenario at the Wes 
laco Water Treatment Plant was defined by the following conditions: 
 
Failure of flexible connections (pigtails) connected to 2 one-ton containers resulting in the total release of 4,000 pounds of chlorine; 
 
Release of the entire amount as a gas in 30 minutes; 
 
Use of the one-hour average ERPG-2 as the toxic endpoint; 
 
Consideration of the population residing within a full circle with radius corresponding to the 
toxic endpoint distance; and 
 
EPA mandated meteorological conditions, specifically a D atmospheric stability class, wind speed of 3 m/sec, and an air temperature of 77:F. 
 
Atmospheric dispersion modeling for the Alternative Release scenario resulted in a chlorine toxic endpoint distance of 0.4 miles and an estimated residential population potentially affected of 1,539. The calculations were performed with the CAMEO and RMPComp32 models as provided by USEPA and NOAA.  The affected population was estimated through Tiger and Landview III information. 
 
Release in enclosed space, in  
direct contact with outside air was considered as a passive mitigation measure for the release scenarios. 
.   
The general Weslaco Water Treatment Plant accidental release prevention program is based on the following key elements. 
 
High level of training of the operators; 
 
Preventive maintenance program; 
 
Use of state of the art process and safety equipment; 
 
Use of accurate and effective operating procedures, written with the participation of the operators;  
 
Performance of a hazard review of equipment and procedures; 
 
Implementation of an audit and inspection program.   
 
Chemical specific prevention steps include availability of Self-Contained-Breathing-Apparatus (SCBA) worn by the operator during connection/disconnection of the chemical supply, awareness of the hazardous and toxic properties of chlorine, and the presence of a chemical detector.  
 
No accidental releases of chlorine have occurred in the past five years.  
 
The facility has an emergency response program which has been co 
ordinated (reviewed) by the City of Weslaco Fire and Police Departments.  Both of these entities are members of the Hidalgo County Local Emergency Planning Committee (LEPC).  The program includes an emergency response decision tree and a notification plan.  Emergency response drills and drill evaluations, and emergency operation and response procedures are reviewed annually.