Source Identification
Power Generation Station |
Muscatine Power and Water |
|
Submission and Acceptance
First-Time Submission |
|
1999-06-09 |
1999-06-04 |
2004-06-04 |
1999-07-23 |
Yes |
|
|
Yes |
Facility Identification
Dun and Bradstreet Numbers (DUNS)
Facility Location Address
Industial Connector Road Maple Grove Road Muscatine, IA 52761 |
Muscatine County |
Facility Latitude and Longitude
EPA Default Map Value Latitude/Longitude
41.4265 |
-91.0486 |
|
Plant Entrance (General) |
Owner or Operator
Muscatine Power and Water |
3192632631 |
3205 Cedar Street |
|
Muscatine |
IA |
52761 |
2204 |
|
|
United States (US) |
Person or Position Responsible for Part 68 (RMP) Implementation
Ray Danz |
Acting Manager, Power Generation |
Emergency Contact
Jim Long |
Laboratory Supervisor |
3192638852 |
3192623444 |
521 |
Other Points of Contact
Local Emergency Planning Committee
Full Time Equivalent Employees
Covered By
OSHA Ranking
Last Safety Inspection
Predictive Filing
Confidential Business Information (CBI)
Reportable Accidents
|