Source Identification
Temple-Belton Regional Sewerage System |
Brazos River Authority |
|
Submission and Acceptance
First-Time Submission |
|
1999-06-22 |
1999-06-18 |
2004-06-18 |
1999-07-13 |
Yes |
|
|
Yes |
Facility Identification
Dun and Bradstreet Numbers (DUNS)
Facility Location Address
2405 East 6th Street Belton, TX 9602-76513 |
Bell County |
Facility Latitude and Longitude
|
|
|
|
GPS - Unspecified |
Administrative Building |
EPA Default Map Value Latitude/Longitude
31.05814 |
-97.449162 |
|
Plant Entrance (General) |
Owner or Operator
Brazos River Authority |
2547761441 |
PO Box 7555 |
|
Waco |
TX |
76714 |
7555 |
|
|
United States (US) |
Person or Position Responsible for Part 68 (RMP) Implementation
Daryl Lee Spiewak, CEM, CFM |
Emergency Action Coordinator |
Emergency Contact
Curtis Smalley |
System Superintendent |
2549396471 |
2549824127 |
|
Other Points of Contact
Local Emergency Planning Committee
Full Time Equivalent Employees
Covered By
OSHA Ranking
Last Safety Inspection
1998-12-01 |
State occupational safety agency |
Predictive Filing
Confidential Business Information (CBI)
Reportable Accidents
|