                      EXECUTIVE SUMMARY 
 
This Risk Management Plan (RMP) has been prepared to meet the requirements of the Risk 
Management Program Rule.   
 
As part of complying with the Risk Management Program Rule, the Polypure Inc. facility in 
Pittsburg, California (Polypure) has reviewed and enhanced previously existing accidental 
release procedures and emergency response policies.  These policies include developing and 
implementing a formal Emergency Action Plan that includes the following: 
 
    Emergency Phone Numbers  
         Internal Incident Notification Policy 
         C.C.C. Department of Health Services Notification Policy 
 
    Plant Emergency Alarm          
         Recognition, Initiation, Evacuation, and Assembly 
 
    Plant Emergency Plan Responsibilities 
 
    Emergency Procedures - General      
         Fire Incident 
         Earthquake 
         Flooding 
         Bomb Threat 
         Off-site Leaks and Spills (Transportation Incidents) 
         Emergency P 
rocedures - Chemical Spills/Releases (General Information) 
         Section I - Chemical Spills/Releases (Other than Acutely Hazardous Materials) 
         Section II - Chemical Spills/Releases (Acutely Hazardous Materials) 
 
    Emergency Procedures - Employee Training 
         Employee Safety Training (General Overview) 
         New Employee Training 
         Basic Operator Training and Continuous Training 
         Emergency Drills 
         Training Records 
 
    Plant Inventories and Equipment Information 
         Site Map 
         Hazardous Material Plot Plan and Tank Designations 
         Emergency Safety Equipment List 
         Chemical Inventory 
 
There are two substances at the Polypure facility that are regulated by the Chemical Accident 
Prevention Provisions defined at 40 CFR Part 68.  These substances are used in various 
processes throughout the facility to produce water treatment polymers. Substances that are used 
by Polypure that are regulated as either toxic 
substances or flammable substances by 40 CFR 
Part 68 are as follows: 
 
Toxic Substances: 
 
         Formaldehyde: Formaldehyde is received and stored as a 37 percent solution in water.  
    The maximum amount of 37 percent formaldehyde stored on-site is 66,000 pounds 
    (24,000 pounds pure formaldehyde). 
 
Flammable Substances: 
 
         Dimethylamine: The maximum amount dimethylamine stored on-site is approximately 
    54,000 pounds. 
 
 
Worst-case Scenarios: 
 
As required by the Risk Management Program Rule, worst case and alternative release scenarios 
were evaluated and are discussed in this RMP.  As required, worst case scenarios are presented in 
the RMP for one toxic substance and one flammable substance.  Alternative scenarios were 
prepared for each of the toxic substances with worst case endpoints located offsite and for one 
flammable substance.  The endpoint represents the distance at which a released substance must 
travel before it disperses sufficiently to no longer pose a h 
azard to the public.   
 
For the worst case scenario, EPA has defined a worst-case release as the release of the largest 
quantity of a regulated substance from a vessel or process line failure that results in the greatest 
distance to a specified endpoint.  For the worst-case analysis, the possible causes of the 
worst-case release or the probability that such a release might occur are not considered.  The 
release is simply assumed to take place and the greatest amount held in a vessel is suddenly 
released.  The results of the worst case scenario analysis were as follows: 
 
         Toxic Substances: The formaldehyde storage tank was assumed to fail and subsequently 
    produce an instantaneous release of the entire tank contents.  The release was assumed to 
    evaporate over a 10-minute time period.  The passive mitigation control of the tank dike 
    were considered in limiting the release impacts.  The distance to the toxic endpoint was 
    estimated to be less than 0.19 miles. 
 
 
        Flammable Substances: The dimethylamine storage tank was assumed to fail and 
    subsequently  produce an instantaneous release of the entire tank contents that results in a 
    vapor cloud explosion.  No passive mitigation controls were considered in limiting the 
    release impacts.  The distance to the explosion endpoint was estimated to be less than 
    0.28 miles. 
 
 
Alternative Release Scenarios: 
 
Alternative release scenarios are more realistic scenarios that result in endpoints that affect public 
receptors.  For formaldehyde the release was assumed to occur as a result of the uncoupling or 
rupture of a  transfer hose during unloading operations into a contained area.  For flammable 
materials, the alternative release scenario assumed that dimethylamine was released as a result of 
the uncoupling or rupture of a hose during unloading operations. The durations for releasing 
these materials from a vessel/pipe for the alternative release scenarios were assumed to occur 
ov 
er a 3-minute time period for formaldehyde and a 5-minute period for dimethylamine since the 
unloading operations are supervised.  With the exception of considering that these transfer 
operations are monitored by personnel at all times, no other active mitigating controls were 
assumed to limit the releases. The results of the alternative release scenario analysis were as 
follows: 
 
         Toxic Substances: 
                   Formaldehyde, 37 percent - 0.06 miles 
 
         Flammable Substance: 
                   Dimethylamine - 0.06 miles 
 
Prevention Program: 
 
To address potential accidental releases, an accidental release prevention program along with 
chemical specific prevention steps have been developed. The key parts to the program are:   
 
    Formal Company Risk Management Procedure that includes: 
         Management System Responsibilities 
         Risk Management Plan Coordinating Review Team 
         Risk Management Plan Changes and Updating 
 
 Recordkeeping Requirements 
         Communication and Coordination of Risk Management Information 
 
    DOT Hazardous Material Training 
    Contractor Performance Selection Process 
    Operating Procedures 
    Emergency Procedures 
    New Employee Environmental Health and Safety Orientation Training Program 
    Process Safety Program Auditing 
    Engineering Controls that Include Automatic Level and Interlock Alarms and Shutdowns 
    24-hour Emergency Communications 
 
Additionally, the facility has programs to address the OSHA Process Safety Management (PSM) 
requirements for the chemicals formaldehyde and dimethylamine such as: 
 
    Employee Participation 
    Process Safety Information 
    Process Hazard Analysis 
    Operating Procedures 
    Training 
    Contractor Safety 
    Pre-startup Safety Reviews 
    Mechanical Integrity 
    Hot Work Permit 
    Management of Change 
    Incident Investigation 
    Emergency Planning and Response 
    Compliance Audits 
 
 
Emergen 
cy Response Program: 
 
The facility also has an emergency response program (ERP) that has been enhanced as part of 
implementing the Risk Management Program.  The ERP has historically been coordinated with 
the site host, the General Chemical Corporation, and the Contra Costa County Department of 
Health Services, Hazardous Materials Division.  As part of the community involvement efforts, 
the facility participates in the local CAER group efforts. 
 
As part of preparing the RMP, the facility's five year accident history was reviewed. No 
accidental releases from covered processes have occurred that resulted in deaths, injuries, or 
significant property damage on-site or off-site; or resulted in off-site evacuations or sheltering in 
place.  
 
 
Safety Improvement: 
 
Polypure is committed to continuous improvement of safety.  Planned changes and policies to 
promote this improvement include the continuous review and update of the plant safety program 
and annual emergency drills to determine and imp 
rove upon deficiencies.  Efforts to update and 
implement additional safe work practices and policies are ongoing and include areas such as: 
 
    Hazard Communication 
    Confined Space Entry 
    Line Breaking Procedures 
    Lock-out Tag-out