Headlee Gas Plant - Executive Summary

| Accident History | Chemicals | Emergency Response | Registration | Source | Executive Summary |

Risk Management Plan  
Headlee Gas Plant 
 
Executive Summary 
 
ACCIDENTAL RELEASE PREVENTION AND RESPONSE POLICIES      
 
The Headlee Gas Plant has a long-standing commitment to worker and public safety.  This commitment is demonstrated by our efforts in accident prevention, such as training personnel and considering safety in the design, installation, operation, and maintenance of our processes.  Our policy is to implement reasonable controls to prevent foreseeable releases of regulated substances.  However, if a release does occur, facility trained personnel will evaluate the situation, take actions within the capabilities of the facility, and/or notify the necessary outside agencies 
 
DESCRIPTION OF THE STATIONARY SOURCE AND REGULATED SUBSTANCES      
 
The Headlee Gas Plant, located in Odessa, Texas, U.S.A., operates a variety of processes to extract natural gas liquids from natural gas.  The Headlee Gas Plant has regulated flammables, including: Propane, Normal Butane, Isobutane, Ethane, and  
Methane. 
 
OFFSITE CONSEQUENCE ANALYSIS RESULTS 
 
The worst-case scenario (WCS) associated with a release of flammable substances at the Headlee Gas Plant is a vapor cloud explosion (VCE) involving the largest inventory of Natural Gas Liquids (NGLs) contained in a single vessel/storage tank. The maximum inventory in this vessel/storage tank is 336,000 pounds.  The entire inventory is assumed to release and ignite, resulting in a Vapor Cloud Explosion (VCE).  The maximum distance to the 1-psi endpoint for this WCS is 0.6 miles.  Although we have numerous controls to prevent such releases and to manage their consequences, no credit for passive mitigation measures was taken into account in evaluating this WCS. 
 
The alternative release scenario (ARS) for flammable substances at the Headlee Gas Plant is a vapor cloud explosion resulting from the release of NGLs from a seal failure in a transfer pump.  The amount released would be 18,000 pounds in 15 minutes.  The maximum distance to the 1-psi 
endpoint for this event is 0.1 mile.  This event was selected as being a practical scenario for use in emergency planning and response.  There are no toxic substances held above the threshold quantities at the Headlee Gas Plant. 
 
GENERAL ACCIDENTAL RELEASE PREVENTION PROGRAM  
 
The following is a summary of the accident prevention program in place at the Headlee Gas Plant.  Processes at the Headlee Gas Plant which are regulated by the Environmental Protection Agency's (EPA's) risk management program (RMP) regulation are also subject to the Occupational Safety and Health Administration's (OSHA's) process safety management (PSM) standard.  This summary addresses each of the OSHA PSM elements and describes the management system in place to implement the accident prevention program. 
 
Employee Participation 
 
The Headlee Gas Plant encourages employees to participate in all facets of process safety management and accident prevention.  Examples of employee participation range from updating  
and compiling technical documents and chemical information to participating as a member of a process hazard analysis (PHA) team.  Employees have access to all information created as part of the facility's accident prevention program.  Specific ways that employees can be involved in the accident prevention program are documented in an employee participation plan that is maintained at the facility and addresses each accident prevention program element.  In addition, the facility has a number of initiatives under way that address process safety and employee safety issues.  These initiatives include forming teams to promote both process and personal safety.  The teams typically have members from various areas of the plant, including operations, maintenance, engineering, and plant management. 
 
Process Safety Information 
 
The Headlee Gas Plant keeps a variety of technical documents that are used to help maintain safe operation of the processes.  These documents address chemical properties  
and associated hazards, limits for key process parameters and specific inventories, and equipment design basis/configuration information.  The Headlee Gas Plant currently has a Process Safety Management/Risk Management (PSM/RMP) Coordinator on site that assists in maintenance of up-to-date process safety information.  A table summarizing the reference documents and their location is readily available as part of the written employee participation plan to help employees locate any necessary process safety information. 
 
Chemical-specific information, including exposure hazards and emergency response/ exposure treatment considerations, is provided in material safety data sheets (MSDSs).  For specific process areas, the facility has documented safety-related limits for specific process parameters (e.g., temperature, level, composition) in Operator Procedure Manual. The facility maintains the process within these limits by using process controls and monitoring instruments, trained personnel 
, and protective instrument systems (e.g., automated shutdown systems). 
 
The facility also maintains files that provide information about the design and construction of process equipment.  This information includes:  material of construction, design and construction of process equipment.  This information, in combination with procedures and equipment operating history, provides a basis for inspection and maintenance activities, as well as for evaluating proposed process and facility changes so safety features in the process are not compromised. 
 
Process Hazard Analysis (PHA) 
 
The Headlee Gas Plant has a comprehensive program to identify and control hazards associated with the various processes are identified and controlled.  Within this program, each process is systematically examined to identify potential hazard controls in place to manage these hazards, and recommend additional controls, as appropriate. 
 
The Headlee Gas Plant uses hazard and operability studies (HAZOP's), which a 
re conducted using a team of employees who have operating and maintenance experience as well as engineering expertise.  This team identifies and evaluates potential hazard of the process as well as accident prevention and mitigation measures, and the team makes suggestions for additional prevention and/or mitigation measures.  
 
The PHA team findings are forwarded to local management for resolution. Implementation of mitigation options in response to PHA findings is based on a relative risk ranking assigned by the PHA team.  The approved mitigation options in response to PHA team findings are tracked until they are completed.  The final resolution of each finding is documented and retained. 
 
The Headlee Gas Plant periodically updates and revalidates the hazard analysis results.  These periodic reviews are conducted at least every 5 years and will be conducted at this frequency until the process is no longer operating.  The results and findings from these updates are documented and ret 
ained.  Once again, the team findings are forwarded to management for consideration, and the final resolution of the findings is documented and retained. 
 
Operating Procedures 
 
The Headlee Gas Plant maintains written procedures that address various modes of process operations, such as (1) Initial startup, (2) normal startup, (3) normal operations, (4) temporary operations, (5) consequences of deviation (6) normal shutdown, and (7) emergency shutdown.  These procedures can be used as a reference by experienced operators and provide a basis for consistent training of new operators.  These procedures are periodically reviewed and annually certified as current and accurate.  The procedures are kept current and accurate by revising them as necessary to reflect changes.  In addition, the Headlee Gas Plant maintains information on how to respond to upper or lower limit exceedances for specific process or equipment parameters.  This information, along with written operating procedures, is re 
adily available to operators in the process unit and for other personnel to use as necessary to safely perform their job tasks. 
 
Training 
 
To complement the written procedures for process operations, the Headlee Gas Plant has implemented a comprehensive training program for all employees involved in operating a process.  New employees receive basic training in process operations if they are not already familiar with such operations.  After successfully completing this training, a new operator is paired with a senior operator to learn process-specific duties and tasks.  After operators demonstrate adequate knowledge to perform the duties and tasks in a safe manner on their own, they can work independently. In addition, all operators periodically receive refresher training on the operating procedures to ensure that their skills and knowledge are maintained at an acceptable level.  This refresher training is conducted at least every 3 years, or more frequently upon request.  All of this 
training is documented for each operator, including the means used to verify demonstrate (e.g., via verbal and written tests, skills demonstration, etc.) that the operator understood the training. 
 
Contractors 
 
The Headlee Gas Plant uses contractors to supplement its workforce during periods of increased maintenance or construction activities. Because some contractors work on or near process equipment, the facility has procedures in place to ensure that contractors (1) perform their work in a safe manner, (2) have the appropriate knowledge and skills, (3) are aware of the hazards in their workplace, (4) understand what they should do in the event of an emergency, (5) understand and follow site safety rules, and (6) inform facility personnel of any hazards that they find during their work.  This is accomplished by providing contractors with (1) a process overview, (2) information about safety and health hazards, (3) emergency response plan requirements, and (4) safe work practices pr 
ior to their beginning work.  In addition, the Headlee Gas Plant evaluates contractor safety programs and performance during the selection of a contractor.  Facility personnel periodically monitor contractor performance with regard to their safety obligations. 
 
Pre-startup Safety Reviews (PSSRs) 
 
The Headlee Gas Plant conducts a PSSR for any new facility or facility modification that requires a change in the process safety information.  The purpose of the PSSR is to see that safety features, procedures, personnel, and equipment are appropriately prepared for startup prior to placing the equipment into service.  This review provides one additional check that construction is in accordance with the design specifications and that all supporting systems are operationally ready. A PSSR involves field verification of the construction and serves a quality assurance function by requiring verification that accident prevention program requirements are properly implemented. 
 
Mechanical Integrit 

 
The Headlee Gas Plant has established practices and procedures to maintain process equipment, pressure vessels, piping systems, relief systems, controls, pumps and compressors in a safe operating condition.  The basic aspects of this program include: (1) conducting training, (2) developing written procedures, (3) performing inspections and tests, (4) correcting identified deficiencies, (5) applying quality assurance measures.  In combination, these activities form a system that maintains the mechanical integrity of the process. 
 
Maintenance personnel receive training on (1) an overview of the process, (2) safety and health hazards, (3) applicable maintenance procedures, (4) emergency response plans, and (5) applicable safe work practices to help ensure that they can perform their jobs in a safe manner. Written procedures provide that work is performed in a consistent manner and serve as basis for training.  Inspections and tests are performed to help verify that equipment function 
s as intended and that equipment is within acceptable limits (e.g., adequate wall thickness for pressure vessels).  If a deficiency is identified, employees will correct the deficiency before placing the equipment back into service.  This may require that a management of change team review the use of the equipment and determine what actions are necessary.    
 
An integral part of the mechanical integrity program is quality assurance.  The Headlee Gas Plant incorporates quality assurance measures into equipment purchases and repairs. This helps determine that new equipment is suitable for its intended use and that proper materials and spare parts are used when repairs are made. 
 
Safe Work Practices 
 
The Headlee Gas Plant has long-standing safe work practices in place to help provide worker and process safety.  Examples of these include (1) control of the entry/presence/exit of support personnel, (2) a lockout/tagout procedure to isolate energy sources for equipment undergoing maintena 
nce, (3) a procedure for safe removal of hazardous substances before process piping or equipment is opened, (4) a permit and procedure to control spark-producing activities (i.e., hot work), and (5) a permit and procedure to verify that adequate precautions are in place before entry into a confined space.  These procedures (and others), along with training of affected personnel, form a system to help perform operations and maintenance activities safely. 
 
Management of Change 
 
The Headlee Gas Plant has a comprehensive system to manage changes to all covered processes.  This system requires that changes to items such as process equipment, chemicals, technology (including process operating conditions), procedures, and other facility changes be properly reviewed and authorized before being implemented.  Changes are reviewed to (1) determine that adequate controls are in place to manage any new hazards and (2) verify that existing controls have not been compromised by the change.  Affecte 
d chemical hazard information, process operating limits, and equipment information, as well as procedures are updated to incorporate these changes.  In addition, operating and maintenance personnel are provided any necessary training on the change. 
 
Incident Investigation 
 
The Headlee Gas Plant promptly investigates all incidents related to a covered process that resulted in, or reasonably could have resulted in, a fire/explosion, toxic gas release, major property damage, environmental loss, or personal injury.  The goal of each investigation is to determine the facts and develop corrective actions to prevent a recurrence of the incident or a similar incident.  The investigation team documents its findings, develops recommendations to prevent a recurrence, and forwards these results to facility management for resolution.  Corrective actions taken in response to the investigation team's findings and recommendations are tracked until they are complete.  The final resolution of each fin 
ding or recommendation is documented, and the investigation results are reviewed with all employees (including contractors) who could be affected by the findings.  Incident investigation reports are retained for at least 5 years so that the reports can be reviewed during future PHAs and PHA revalidation.  
 
Compliance Audits 
 
To help determine that the accident prevention program is functioning properly, the Headlee Gas Plant periodically conducts an audit to determine whether the procedures and practices required by the accident prevention program are being implemented.  Compliance audits are conducted at least every 3 years.  Both hourly and staff personnel participate in these audits.  The audit team develops findings that are forwarded to facility management for resolution.  Corrective actions taken in response to the audit team's findings are tracked until they are complete.  The final resolution of each finding is documented, and the two most recent audit reports are retained.   
 
 
CHEMICAL-SPECIFIC PREVENTION STEPS 
 
The processes at the Headlee Gas Plant have hazards that must be managed for continued safe operation.  The following is a description of existing safety features applicable to prevention of accidental releases of regulated substances in the facility. 
 
Universal Prevention Activities 
 
The accident prevention program summarized previously is applied to all RMP-covered processes at the Headlee Gas Plant.  Collectively, these prevention program activities help prevent potential accident scenarios that could be caused by equipment failures and human errors. 
 
Specialized Safety Features 
 
The Headlee Gas Plant has safety features on many units to help (1) contain/control a release, (2) quickly detect a release, and (3) reduce the consequences of (mitigate) a release.  The following types of safety features are used in the covered processes:  
 
Release Detection 
 
1.    Hydrocarbon (if applicable - and hydrogen sulfide) detectors with alarms. 
 
Relea 
se Containment/Control 
 
1. Process relief valves that discharge to a flare to capture and incinerate episodic releases 
 
2. Valves to permit isolation of the process (manual or automated) 
 
3. Automated shutdown systems for specific process parameters (e.g., high temperature) 
 
4. Curbing or diking to contain liquid releases 
 
5. Redundant equipment and instrumentation (e.g., uninterruptible power supply for process control system, backup firewater pump) 
 
6. Atmospheric relief devices. 
 
Release Mitigation 
 
1. Fire suppression and extinguishing systems  
 
2. Deluge system for specific equipment 
 
3. Trained emergency response personnel 
 
4. Personal protective equipment (e.g., chemical protective clothing, self-contained breathing apparatus) 
 
5. Blast-resistant shield to help protect control systems and personnel. 
 
FIVE-YEAR ACCIDENT HISTORY 
 
The Headlee Gas Plant has an excellent record of accident prevention over the past 5 years.  There have been no accidental relea 
ses of regulated substances that resulted in onsite or offsite effects during the prior five years at the Headlee Gas Plant.  In case of an incident, we will investigate the incidents to determine ways to prevent similar incidents from recurring.  
 
EMERGENCY RESPONSE PROGRAM INFORMATION 
 
The Headlee Gas Plant maintains a written emergency action plan, which is in place to help protect worker and public safety as well as the environment.  The Emergency Action Plan identifies steps to be taken in case of an accidental release including: proper first aid and medical treatment for exposures, evacuation plans and accounting for personnel after an evacuation, notification of local emergency response agencies and the public if a release occurs. Employees receive training in these procedures as necessary to perform their specific emergency duties.  The Emergency Action Plan is updated when necessary, based on modifications made to processes or other Headlee Gas Plant facilities.  The Emergen 
cy Action Plan changes are administered through the MOC process, which includes informing and/or training affected personnel in the changes. 
 
The overall emergency response program for the Headlee Gas Plant has been coordinated with local Ector County, Odessa Fire Department.  This coordination includes periodic meetings with the Local Emergency Planning Committee (LEPC), which includes local emergency response officials, local government officials, and industry representatives.  The Headlee Gas Plant has around-the-clock communications capability with appropriate emergency response organizations (e.g., Odessa Fire Department, Odessa Police Department and Ector County Sheriff Office).  This interface provides the means of notifying the public of an incident, if necessary, as well as facilitating quick response to an incident.  The Headlee Gas Plant conducts periodic emergency drills that involve local emergency responders and provides periodic refresher training to local emergency res 
ponders regarding the hazards of regulated substances in the Headlee Gas Plant. 
 
 
PLANNED CHANGES TO IMPROVE SAFETY 
 
The Headlee Gas Plant resolves findings from PHAs, safety audits, and incident investigations.  The following types of changes have been implemented over the last few years in response to findings:  Installation of blast shield for the protection of plant operators, replacement of propane surge tank, and installation of gas monitoring in engine room.