RMP Executive Summary 
Giant Refining Company, Ciniza Refinery 
 
1.    Accidental Release Prevention and Emergency Response Policies 
We at Ciniza Refinery are strongly committed to employee, public, and environmental safety.  This commitment is demonstrated by our comprehensive accidental release prevention program which covers areas such as design, installation, operating procedures, maintenance, and employee training associated with the processes at our facility.  It is our policy to implement appropriate controls to prevent possible releases of regulated substances. 
 
 
2.    The Stationary Source and the Regulated Substances Handled 
Our facility's primary activity is petroleum refining.  We have 15 regulated substances present at our facility in regulated quantities.  These substances include 1-Butene, 2-Butene-cis, 2-Butene-trans  [2-Butene, (E)], 2-Methyl-1-butene, Butane, Ethane, Ethylene  [Ethene], Hydrogen, Hydrogen fluoride/Hydrofluoric acid [HF acid], Isobutane  [Propane, 2-methyl], I 
sopentane  [Butane, 2-methyl-], Methane, Pentane, Propane, and Propylene  [1-Propene].  The various hydrocarbons in this list , with the exception of methane and ethane, are components of the liquid fuels produced at this facility (gasoline, LPG, etc.).  Methane and ethane are gaseous byproducts of the refining process (essentially natural gas) which are consumed onsite as fuel for the processing of crude oil.  Hydrogen is also a byproduct of the refining process which is utilized onsite both as a fuel and in the sulfur removal process for the production of clean, low-sulfur motor fuels.  HF acid is utilized as a catalyst in the conversion (alkylation) of light, gaseous hydrocarbons into extremely clean, high quality gasoline.  
 
 
3.    The Worst Case Release Scenarios and the Alternative Release Scenarios, Including Administrative Controls and Mitigation Measures to Limit the Distances for Each Reported Scenario 
To perform the required offsite consequence analysis for our facility, we hav 
e used the EPA's OCA Guidance Reference Tables and Equations.  The following paragraphs provide details of the chosen scenarios. 
 
The worst case release scenario submitted for Program 2 and 3 toxic substances as a class involves a catastrophic vessel failure in the Alkylation Unit.  In this scenario, 65,000 lbs of HF acid is released from the HF storage vessel.  The liquid release is assumed to form a 1 cm deep pool from which evaporation takes place.  The entire pool is estimated to evaporate over a 10 minute period.  The scenario assumes a 100% release of the maximum capacity of the storage vessel.  Under conditions of Class F atmospheric stability and a 1.5 m/s wind speed (extremely stable and calm), the maximum distance of 9.9 miles is obtained corresponding to a toxic endpoint for HF of 0.016 mg/L. 
 
One alternative HF release scenario considered assumes a damaged / broken HF supply line in the Alkylation Unit.  This scenario involves the release of 750 lb. of  liquid HF acid.  The 
liquid is assumed to be released to form a 1 cm deep pool from which evaporation takes place.  The entire pool is estimated to evaporate within 10 minutes.  Under neutral weather conditions, the maximum distance to the HF toxic endpoint of 0.016 mg/L is 0.43 miles. 
 
A second alternative release scenario for Hydrofluoric acid assumes a liquid release due to an HF transfer hose failure during HF delivery to the facility.  The scenario involves the total release of the transfer system's 70 lb. inventory of HF acid.  The liquid acid is assumed to form a 1 cm deep pool from which evaporation takes place.  The entire pool is estimated to evaporate within 1 minute.  Under neutral weather conditions, the maximum distance to the 0.016 mg/L toxic endpoint is 0.43 miles. 
 
A third alternative release scenario for HF acid involves a gaseous HF release from processing equipment in the Alkylation Unit.  This scenario assumes a release of 275 lb. of HF in a vapor form.  The HF-containing vapor is pre 
sumed to be released over a 10 minute period.  Under neutral weather conditions, the maximum distance to the 0.016 mg/L HF toxic endpoint is 0.31 miles. 
 
The worst case release scenario submitted for Program 2 and 3 flammable substances as a class involves the catastrophic failure of a Natural Gasoline storage tank in the facility's Tank Farm.  In this scenario, 4,920,000 lb. of a flammable mixture containing approximately 50% moderately volatile materials such as Pentane, Isopentane, and Butane and approximately 50% heavier, gasoline-range components is released.  In accordance with the Risk Management Program's Worst Case Scenario requirements, it is presumed that the entire contents of a full storage tank are released as a vapor (a physical impossibility) which then finds an ignition source resulting in 10 percent of the released quantity participating in a vapor cloud explosion.  Under worst case weather conditions (extremely stable and calm), a calculated distance of 1.37 miles is 
obtained corresponding to an endpoint of 1 psi overpressure. 
 
One alternative release scenario submitted for Program 2 and 3 flammable substances involves a release from an LPG storage vessel in the facility's Tank Farm.  The release is assumed to result in a BLEVE.  The scenario involves the release of 127,000 lb. of LPG, a highly volatile, flammable mixture consisting primarily of Propane and Isobutane.  Under neutral weather conditions, the maximum distance to the flammable endpoint of 5 kw/m2 is 0.44 miles. 
 
A second alternative release scenario submitted for Program 2 and 3 flammable substances involves a hydrocarbon vapor release from the process equipment in the Alkylation Unit.  The modeled vapor release is assumed to result in a Vapor Cloud Fire.  The scenario involves the release of 8800 lb. of flammable gas (primarily Propane) over a period of 10 minutes.  Under neutral weather conditions, the maximum distance to the flammable endpoint of the lower flammability limit is <0. 
06 miles. 
 
 
4.    The General Accidental Release Prevention Program and the Chemical-Specific Prevention Steps 
The Ciniza Refinery has taken all the necessary steps to comply with the accidental release prevention requirements set out under 40 CFR Part 68.  This facility was designed and constructed in accordance with API and ASME Standards.    The following sections briefly describe the elements of the release prevention program that are in place at our facility. 
 
Process Safety Information 
Ciniza Refinery maintains a detailed record of safety information that describes the chemical hazards, operating parameters, and equipment designs associated with all processes. 
 
Process Hazard Analysis 
Our facility conducts comprehensive studies to ensure that hazards associated with our processes are identified and controlled efficiently.  The methodologies used to carry out these analyses are What If, What If/Checklist (combined) and HAZOP.  The studies are undertaken by a team of qualified personn 
el with expertise in engineering and process operations and are revalidated at an interval of 3 years.  Any findings related to the hazard analyses are addressed in a timely manner.  The most recent PHA update was performed on 1/9/1998. 
 
Operating Procedures 
For the purposes of safely conducting activities within our covered processes, Ciniza Refinery maintains written operating procedures.  These procedures address various modes of operation such as initial startup, normal operations, temporary operations, emergency shutdown, emergency operations, normal shutdown, and startup after a turnaround.  The information is regularly reviewed and is readily accessible to operators involved in the processes. 
 
Training 
Ciniza Refinery has a comprehensive training program in place to ensure that employees who are operating processes are competent in the operating procedures associated with these processes.  Refresher training is provided at least every 3 years and more frequently as needed. 
 
Mech 
anical Integrity 
Ciniza Refinery carries out highly documented inspections and maintenance checks on process equipment to ensure proper operations.  Process equipment examined during these checks includes, among other things, pressure vessels, storage tanks, piping systems, relief and vent systems, emergency shutdown systems, controls, and pumps.  Inspection and maintenance operations are carried out by qualified personnel with previous training in maintenance practices.  Furthermore, these personnel are offered specialized training as needed.  Any equipment deficiencies identified by these checks are corrected in a safe and timely manner. 
 
Management of Change 
Written procedures are in place at the Ciniza Refinery to manage changes in process chemicals, technology, equipment, and procedures.  The most recent review/revision of maintenance procedures was performed on 06/07/1999.  Process operators, maintenance personnel, or any other employee whose job tasks are affected by a modificat 
ion in process conditions are promptly made aware of and offered training to deal with the modification. 
 
Pre-startup Reviews 
Pre-startup safety reviews related to new processes and to modifications in established processes are conducted as a regular practice at the Ciniza Refinery.  The most recent review was performed on 06/05/1999.  These reviews are conducted to confirm, prior to placing equipment into operation, that construction and equipment as well as operating and maintenance procedures are suitable for a safe startup. 
 
Compliance Audits 
Ciniza Refinery will conduct audits on a regular basis to determine whether the provisions set out under the RMP rule are being implemented.  These audits will be carried out at least every 3 years, and any corrective actions required as a result of the audits will be undertaken in a safe and prompt manner. 
 
Incident Investigation 
Ciniza Refinery promptly investigates any incident that has resulted in or could reasonably have resulted in a cat 
astrophic release of a regulated substance.  These investigations are undertaken to identify the circumstances leading to the incident as well as any corrective actions needed to prevent the incident from reoccurring.  All reports are retained for a minimum of 5 years. 
 
Employee Participation 
Ciniza Refinery truly believes that process safety management and accident prevention is a team effort.  Company employees are strongly encouraged to express their views concerning accident prevention issues and to recommend improvements.  In addition, our employees have access to all information created as part of the facility's implementation of the RMP rule, including information resulting from process hazard analyses. 
 
Contractors 
On occasion, our company hires contractors to conduct specialized maintenance and construction activities.  Prior to selecting a contractor, an evaluation of the past safety performance of the contractor is carried out.  Ciniza Refinery has a strict policy of informi 
ng the contractors of known potential hazards related to the contractor's work and the processes around which the contractor will be working.  Contractors are also informed of all the procedures for emergency response should an accidental release of a regulated substance occur. 
 
 
5.    Five-year Accident History 
Due to this facility's stringent release prevention policies and on-going prevention efforts, the number and size of accidental releases at this site have been reduced to a minimum.  These release events and the estimated release quantities associated with them are summarized below. 
 
There have been 3 accidental releases of regulated substances from our facility within the last 5 years which have resulted in injuries or significant property damage.  The first release took place on 07/16/1994 and involved approximately 500 lbs of Propane and 50 lbs of Hydrofluoric acid.  No deaths or injuries occurred offsite as a result of this accident.  Onsite, there was one minor injury and som 
e property damage.  There were no onsite deaths. 
 
A release of crude oil containing approximately 215 lbs of Isopentane, 200 lb. of Butane, 50 lbs of Isobutane, 215 lbs of Propane and 310 lbs of Pentane occurred on 04/05/1996.  No deaths or injuries occurred either onsite or offsite as a result of this occurrence.  There was some onsite property damage. 
 
A release of LPG containing an estimated 125 lbs of Isobutane, 5 lbs of Butane, and 5000 lbs of Propane took place on 05/02/1999.  No deaths or injuries occurred offsite as a result of this accident. Onsite, there was one injury and no deaths. 
 
 
6.    Emergency Response Plan 
Ciniza Refinery maintains a written emergency response plan to deal with accidental releases of hazardous materials.  The plan includes all aspects of emergency response including adequate first aid and medical treatment, evacuations, notification of local emergency response agencies and the public, as well as post-incident decontamination of affected areas. 
 
To ensur 
e proper functioning, our emergency response equipment is regularly inspected and serviced.  In addition, the plan is promptly updated to reflect any pertinent changes taking place within our processes that would require a modified emergency response. 
 
The McKinley County LEPC is the Local Emergency Planning Committee (LEPC) for this area.  The Ciniza Refinery is a member of a mutual aid group consisting of emergency response groups from surrounding communities.  In addition, onsite mutual aid training/orientation sessions are conducted periodically with various local emergency response groups. The Whispering Cedars Fire Department is the primary agency with which coordination of emergency response efforts is conducted. 
 
 
7.    Planned Changes to Improve Safety 
Several developments and findings have resulted from the implementation of the various elements of our accidental release prevention program and related programs.  Major improvements to the facility's process control system,  fired 
heater controls, and emergency shutdown systems have been undertaken over the past year.  Additional equipment improvements / upgrades in these areas are planned for installation during the balance of 1999.  Improvements to the facility's storage tank dike system are planned over the next several years with dike improvement beginning during mid-1999.  Process area paving and drainage improvements to enhance emergency response capabilities began several years ago with major portions of this work being completed in 1998.  Major upgrades to the facility's stormwater containment infrastructure were completed in 1998.  Additional major improvements to the facility's wastewater handling system are scheduled for late 1999 through early 2001.